The following are the results of bids received September, 2023 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed. The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.
NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
View Project Details for this Bid Letting
| BUTLER -- PROJECT # 20-03-12-03 9/21/2023 Large Project Letting
| SHELL ROCK BEND WMA
| ROAD MAINTENANCE | | BIDS RECEIVED: |
Skyline Construction Inc
|
$39,362.75 |
Nagel Construction LLC
|
$41,061.00 |
Heartland Asphalt Inc
|
$64,183.33 |
Cole Excavating LLC
|
$67,071.00 |
Lodge Construction Inc
|
$79,304.00 |
|
| MARION -- PROJECT # 23-05-63-04 9/21/2023 Large Project Letting
| RED ROCK WMU/LAKE KEOMAH
| ROAD MAINTENANCE | | BIDS RECEIVED: |
Skyline Construction Inc
|
$171,874.30 |
Nagel Construction LLC
|
$185,486.75 |
Leffler Dirtworks LLC
|
$208,327.00 |
RW Excavating Solutions LC
|
$208,402.80 |
Manatts Inc
|
$312,992.39 |
|
| MONONA -- PROJECT # 24-01-67-02 9/21/2023 Large Project Letting
| TIEVILLE BEND WMA
| PUMP REPLACEMENT | | BIDS RECEIVED: |
Electric Pump LLC
|
$133,370.00 |
|
| TAMA -- PROJECT # 24-05-86-01 9/21/2023 Large Project Letting
| HICKORY HILLS PARK
| CASEY LAKE RESTORATION | | BIDS RECEIVED: |
Three Oaks Construction Inc
|
$2,185,894.85 |
Legacy Corporation of IL
|
$2,387,650.30 |
Hatch Grading & Construction Inc
|
$2,458,082.75 |
Boomerang Corp of Iowa
|
$2,469,859.00 |
JB Holland Construction, Inc
|
$2,563,560.35 |
Peterson Contractors Inc
|
$2,999,988.00 |
C J Moyna & Sons LLC
|
$3,099,955.40 |
RW Excavating Solutions LC
|
$3,246,890.50 |
Veit & Company, Inc
|
$4,764,418.25 |
|
|