The following are the results of bids received March, 2023 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed. The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.
NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
View Project Details for this Bid Letting
| HARRISON -- PROJECT # 21-04-43-02 3/23/2023 Large Project Letting
| MISSOURI RIVER WILDLIFE UNIT
| FLOOD DAMAGE REPAIRS | | BIDS RECEIVED: |
Next Phase Environmental, Inc
|
$1,106,860.16 |
KRW Construction, Inc
|
$1,608,890.08 |

|
| JOHNSON -- PROJECT # 21-06-52-04 3/23/2023 Large Project Letting
| IOWA RIVER WILDLIFE UNIT
| SWAN LAKE ROAD CULVERT REPLACEMENT | | BIDS RECEIVED: |
Ardo Schmidt Construction Inc
|
$143,320.00 |
Rock N Load
|
$152,310.00 |
Peterson Contractors Inc
|
$161,896.75 |
Boomerang Corp of Iowa
|
$167,000.00 |
Connolly Construction Inc
|
$196,665.70 |

|
| UNION -- PROJECT # 21-04-88-03 3/23/2023 Large Project Letting
| GREEN VALLEY STATE PARK
| SPILLWAY REPAIR | | BIDS RECEIVED: |
Structural Concrete Inc
|
$507,346.00 |
Engineering & Construction Innovations, Inc
|
$885,845.00 |

|
| APPANOOSE -- PROJECT # 22-05-04-10 3/2/2023 Small Project Letting
| RATHBUN FISH HATCHERY
| TRANSFORMER REPLACEMENT (REBID) | | BIDS RECEIVED: |
Campbell Electric
|
$35,000.00 |
The Esco Group
|
$59,805.00 |

|
| CALHOUN -- PROJECT # 22-01-13-01 3/9/2023 Small Project Letting
| TWIN LAKES
| BOAT RAMP REPLACEMENT | | BIDS RECEIVED: |
Richards Construction Co Inc
|
$43,883.50 |
Jensen Builders Ltd
|
$65,010.00 |

|
| DECATUR -- PROJECT # 23-05-27-01 3/9/2023 Small Project Letting
| NINE EAGLES STATE PARK
| SEPTIC SYSTEM REPLACEMENT | | BIDS RECEIVED: |
Haworth Land Construction
|
$11,944.00 |
Friday Excavation LLC
|
$15,600.00 |
Vicker Drilling LLC
|
$16,450.00 |
Smith Landworx
|
$17,000.00 |
Bud Jones Construction Co Inc
|
$18,823.00 |
Mike's Construction & Excavating LLC
|
$20,947.00 |
Hoffman Communications
|
$24,332.40 |

|
| POTTAWATTAMIE -- PROJECT # 23-04-78-03 3/9/2023 Small Project Letting
| LAKE MANAWA STATE PARK
| SIGN INSTALLATION | | BIDS RECEIVED: |
Venture Concrete LLC
|
$33,825.00 |
Dovel Construction LLC
|
$38,000.00 |

|
| CERRO GORDO -- PROJECT # 23-03-17-02 3/23/2023 Small Project Letting
| CLEAR LAKE FISHERIES MANAGEMENT UNIT
| FLOORING REPLACEMENT | | BIDS RECEIVED: |
Master Floors of North Iowa
|
$10,919.60 |
|
|