IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Missouri River Wildlife Unit  Date: 3/23/2023  Project No.  
  Flood Damage Repairs  County:   HARRISON  Time: 11:00 a.m.  21-04-43-02

 

 
1
2
3
Estimated Cost: $549,000.00
Contractor: 
Next Phase Environmental, IncKRW Construction, Inc
Funding Source: 75% Federal-FEMA 1, 25% Executive Council, 25692 240th St
414 S 5th St

Underwood IA  51576Blair NE  68008  
Plan Sets Requested: 5
Quantities
402-510-2759402-533-8100
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Granular Surfacing, 1" Roadstone (Weedland Access - Site #1)203Tons$59.00$11,977.00 $60.27$12,234.81 $0.00 
2Mobilization1L.S.$3,079.08$3,079.08 $500.00$500.00 $0.00 
3Base Hauled and Placed, Macadam Stone Base65Tons$64.50$4,192.50 $64.77$4,210.05 $0.00 
4Earthwork, Fill Hauled and Placed, Native Soil1L.S.$6,942.20$6,942.20 $14,900.00$14,900.00 $0.00 
5Granular Surfacing, 1" Roadstone70Tons$59.00$4,130.00 $60.27$4,218.90 $0.00 
6Mobilization1L.S.$3,025.00$3,025.00 $500.00$500.00 $0.00 
7Revetment, Class E (Site 1: Levee Embankment)74Tons$75.60$5,594.40 $75.15$5,561.10 $0.00 
8Filtration Material B (Site 1: Levee Embankment)39C.Y.$100.00$3,900.00 $68.50$2,671.50 $0.00 
9Stop Log Structure Repairs1L.S.$39,186.00$39,186.00 $35,000.00$35,000.00 $0.00 
10Sluice Gate, Remove And Replace (Site 2: Lift Pump Station)1Each$66,414.40$66,414.40 $36,000.00$36,000.00 $0.00 
11Pipe Clean-Out, 36" (Site 2: Lift Pump Station)1L.S.$11,800.00$11,800.00 $62,000.00$62,000.00 $0.00 
12Pump Station Repairs1L.S.$238,725.00$238,725.00 $271,500.00$271,500.00 $0.00 
13Mobilization1L.S.$23,528.89$23,528.89 $1,500.00$1,500.00 $0.00 
14Granular Surfacing, 1" Roadstone (Site 1: Gravel Access Road)245Tons$52.72$12,916.40 $55.82$13,675.90 $0.00 
15Granular Surfacing, 1" Roadstone (Site 2: Gravel Access Road)464Tons$52.72$24,462.08 $55.82$25,900.48 $0.00 
16Granular Surfacing, 1" Roadstone (Site 3: Gravel Access Road)480Tons$52.72$25,305.60 $55.82$26,793.60 $0.00 
17Pipe Clean-Out, 18" (Site 4: North Pump Access Road)1L.S.$3,500.00$3,500.00 $2,500.00$2,500.00 $0.00 
18Granular Surfacing, 1" Roadstone (Site 4: North Pump Access Road)959Tons$52.72$50,558.48 $55.82$53,531.38 $0.00 
19Sediment, Removal and Disposal (Site 5: North Pump Access Road)305.8C.Y.$39.00$11,926.20 $155.18$47,454.044 $0.00 
20Base Hauled and Placed, 1 1/2" Roadstone (Site 5: North Pump Access Road)289Tons$52.72$15,236.08 $55.82$16,131.98 $0.00 
21Subbase Hauled and Placed, Macadam Stone Base (Site 5: North Pump Access Road)269Tons$58.24$15,666.56 $60.82$16,360.58 $0.00 
22Granular Surfacing, 1" Roadstone (Site 5: North Pump Access Road)289Tons$52.72$15,236.08 $55.82$16,131.98 $0.00 
23Earthwork, Fill Hauled and Placed, Unclassified (Site 6)1L.S.$52,010.00$52,010.00 $60,000.00$60,000.00 $0.00 
24Base Hauled and Placed, 1 1/2" Roadstone (Site 6)104Tons$52.72$5,482.88 $55.82$5,805.28 $0.00 
25Subbase Hauled and Placed, Macadam Stone Base (Site 6)97Tons$58.24$5,649.28 $60.82$5,899.54 $0.00 
26Granular Surfacing, 1" Roadstone (Site 6)104Tons$52.72$5,482.88 $55.82$5,805.28 $0.00 
27Mobilization1L.S.$16,400.00$16,400.00 $2,000.00$2,000.00 $0.00 
28Sediment, Removal and Disposal (Site 3: Parking Lot)660C.Y.$39.00$25,740.00 $155.18$102,418.80 $0.00 
29Granular Surfacing, 1" Roadstone (Site 3: Parking Lot)312Tons$52.72$16,448.64 $59.82$18,663.84 $0.00 
30Sediment, Removal and Disposal (Site 4: Boat Ramp)15C.Y.$60.00$900.00 $155.18$2,327.70 $0.00 
31Mobilization1L.S.$5,413.92$5,413.92 $750.00$750.00 $0.00 
32Earthwork, Fill Hauled and Placed, Clay Mix1L.S.$4,800.00$4,800.00 $3,500.00$3,500.00 $0.00 
33Culvert, CMP Entrance, 36"34L.F.$106.38$3,616.92 $177.14$6,022.76 $0.00 
34Mobilization1L.S.$1,820.00$1,820.00 $500.00$500.00 $0.00 
35Granular Surfacing, 1" Roadstone (Site 1)24Tons$51.60$1,238.40 $66.79$1,602.96 $0.00 
36Earthwork, Fill Hauled and Placed, Native Soil (Site 3)1L.S.$23,320.00$23,320.00 $15,500.00$15,500.00 $0.00 
37Earthwork, Fill Hauled and Placed, Native Soil (Site 4)1L.S.$68,840.00$68,840.00 $47,300.00$47,300.00 $0.00 
38Base Hauled and Placed, 1 1/2" Roadstone (Site 4)161Tons$51.60$8,307.60 $66.79$10,753.19 $0.00 
39Subbase Hauled and Placed, Macadam Stone Base (Site 4)150Tons$57.10$8,565.00 $69.58$10,437.00 $0.00 
40Granular Surfacing, 1" Roadstone (Site 4)110Tons$51.60$5,676.00 $66.79$7,346.90 $0.00 
41Earthwork, Fill Hauled and Placed, Native Soil (Site 5)1L.S.$8,856.00$8,856.00 $5,500.00$5,500.00 $0.00 
42Base Hauled and Placed, 1 1/2" Roadstone (Site 5)69Tons$51.60$3,560.40 $66.79$4,608.51 $0.00 
43Subbase Hauled and Placed, Macadam Stone Base (Site 5)64Tons$57.10$3,654.40 $69.58$4,453.12 $0.00 
44Granular Surfacing, 1" Roadstone (Site 5)46Tons$51.60$2,373.60 $66.79$3,072.34 $0.00 
45Sediment, Removal and Disposal (Site 6)3091C.Y.$38.19$118,045.29 $155.18$479,661.38 $0.00 
46Granular Surfacing, 1" Roadstone (Site 6)1099Tons$51.60$56,708.40 $66.79$73,402.21 $0.00 
47Base Hauled and Placed, 1 1/2" Roadstone (Site 7)69Tons$51.60$3,560.40 $66.79$4,608.51 $0.00 
48Subbase Hauled and Placed, Macadam Stone Base (Site 7)64Tons$57.10$3,654.40 $70.58$4,517.12 $0.00 
49Granular Surfacing, 1" Roadstone (Site 7)48Tons$51.60$2,476.80 $66.79$3,205.92 $0.00 
50Mobilization1L.S.$25,015.10$25,015.10 $1,000.00$1,000.00 $0.00 
51Sediment, Removal and Disposal5C.Y.$39.00$195.00 $155.18$775.90 $0.00 
52Mobilization1L.S.$1,500.00$1,500.00 $200.00$200.00 $0.00 
53Sediment, Removal and Disposal (Site 1: Low Water Crossing Road)204C.Y.$39.00$7,956.00 $155.18$31,656.72 $0.00 
54Granular Surfacing, Macadam Stone Base (Site 2)57Tons$57.10$3,254.70 $70.58$4,023.06 $0.00 
55Revetment, Class E (Site 2)51Tons$70.20$3,580.20 $88.28$4,502.28 $0.00 
56Vegetation Obstacles, Removal (Site 3)47C.Y.$48.00$2,256.00 $155.18$7,293.46 $0.00 
57Mobilization1L.S.$3,200.00$3,200.00 $500.00$500.00 $0.00 
      $1,106,860.16  $1,608,890.084  $0.00 
 



 