PROJECTS LETTING -  June , 2018

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ADAMS 19-04-02-01 Mount Ayr Fisheries Management Unit - Lake Icaria Fishing Jetty Repairs-2018-06-21   Bid Completion detail
POTTAWATTAMIE 16-04-78-03 Lake Manawa State Park - Picnic Area - Vegetative Barrier-2018-06-21   Bid Completion detail
STORY 19-02-85-01 State Forest Nursery - Restroom Renovation-2018-06-21   Bid Completion detail
STORY 19-02-85-01 State Forest Nursery - Restroom Renovation-2018-06-21   Bid Completion detail
UNION 17-04-88-03 Grand River Wildlife Unit - 3 Mile Marina PCC Boat Ramp Repair-2018-06-21   Bid Completion detail
CASS 18-04-15-01 Lake Anita State Park - Check-in Kiosk-2018-06-28   Bid Completion detail
DELAWARE 18-06-28-02 Maquoketa Wildlife Unit - Takes Wetland Restoration-2018-06-28   Bid Completion detail
LUCAS 18-05-59-02 Stephens State Forest - South Pond Outlet Replacement-2018-06-28   Bid Completion detail
DECATUR 19-05-27-01 Nine Eagles State Park - Silt Ponds Repairs-2018-07-05   Bid Completion detail
JASPER 19-05-50-01 Rock Creek State Park - Pit Vault Latrine at NW Boat Ramp-2018-07-05   Bid Completion detail
MARION 19-05-63-01 Elk Rock State Park - Boat Ramp/Intersection Concrete Additions-2018-07-05   Bid Completion detail
WARREN 19-05-91-01 Lake Ahquabi State Park - Shoreline Riprap Beach to Fish House-2018-07-05   Bid Completion detail
FREMONT 19-04-36-01 Waubonsie - pool removal-2018-07-12   Bid Completion detail
MONTGOMERY 19-04-69-01 Viking Lake - silt pond repairs-2018-07-12   Bid Completion detail
APPANOOSE 18-05-04-07 Honey Creek State Park - Shower Building Replacement-2018-07-19   Bid Completion detail
BUENA VISTA 18-01-11-01 Storm Lake - Chautauqua Jetty Repair-2018-07-19   Bid Completion detail
LINN 19-06-57-01 Palisades-Kepler - New Well And Watermain-2018-07-19   Bid Completion detail
WEBSTER 15-02-94-08 Brushy Creek Recreation Area - Boone Forks Boat Ramp-2018-07-19   Bid Completion detail




ADAMS -- PROJECT # 19-04-02-01                6/21/2018                Large Project Letting
MOUNT AYR FISHERIES MANAGEMENT UNIT
LAKE ICARIA FISHING JETTY REPAIRS
Proposal Guarantee: $7,500
Completion Date: 9/30/2018

   This project consists of repairing wind and wave erosion to thirteen fishing jetties at Lake Icaria by placing 2,475 tons of Class "E" riprap on the side slopes of jetties, 345 tons of crushed rock surfacing on the tops of jetties, and incidental work as required by the Plans and/or the DNR Construction Inspector.

ESTIMATED QUANTITIES:
    Class 'E' Riprap     2,475 Tons
    Class 'A' Surfacing     345 Tons
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 16-04-78-03                6/21/2018                Large Project Letting
LAKE MANAWA STATE PARK
PICNIC AREA - VEGETATIVE BARRIER
Proposal Guarantee: $3,750
Completion Date: 11/1/2018

   THIS PROJECT INVOLVES PLANTING A VEGETATIVE BARRIER IN THE PICNIC AREA.

ESTIMATED QUANTITIES:
    Tree Planting, Conifers, By Count, with Warranty     53 Each
    Tree Planting, Shrubs, By Count, with Warranty     107 Each
    Mulch     0.26 Acres
    Site Work     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




STORY -- PROJECT # 19-02-85-01                6/21/2018                Large Project Letting
STATE FOREST NURSERY
RESTROOM RENOVATION
Proposal Guarantee: $6,200
Completion Date: 12/28/2018

   The State Forestry Nursery Building restroom will have the restroom area renovated. Part of the Break Room 105 will be used as an expansion of the restroom area and installation of a new kitchenette area. There will be four alternates: #1 will consist of a new toilet in Restroom 120, #2 will consist of washer and dryer electric and plumbing in Mechanical 126, #3 will consist of reroofing the entry vestibule 100, and #4 will consist of replacing all ceiling tiles and lighting in the public areas. This renovation will update the currently aged interior of the State Nursery office.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    STOOP FOOTING     1 L.S.
    RESTROOM REMODEL     1 L.S.
    KITCHENETTE REMODEL     1 L.S.
    RESTORATION     1 L.S.
    MOBILIZATION     1 L.S.
Alternate
    ALTERNATE#1: RESTROOM 120 REMODEL     1 L.S.
Alternate
    ALTERNATE#2: MECHANICAL 126 REMODEL     1 L.S.
Alternate
    ALTERNATE#3: ENTRY VESTIBULE 100 REROOF     1 L.S.
Alternate
    ALTERNATE#4: PUBLIC AREA CEILING AND CARPET TILES, AND LIGHTING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 18-05-04-07                7/19/2018                Large Project Letting
HONEY CREEK STATE PARK
SHOWER BUILDING REPLACEMENT
Proposal Guarantee: $16,000
Completion Date: 11/30/2018

   The contractor shall demolish the existing North Campground shower building, including foundations, shown on plans. Prior to demo, the contractor shall cut and cap all utilities and protect for future use. Contractor shall then grade for and install a new Iowa Standard, family-style precast shower building, as specified. Contractor shall run and install all utilities, site works shown on plans and restore the area of construction. As an alternate to this contract, the contractor shall install one new Iowa Standard precast concrete double pit latrine and site work, as shown on plans.

ESTIMATED QUANTITIES:
    DEMOLITION     1 L.S.
    GRADING     1 L.S.
    SEEDING, FERTILIZING, AND MULCHING     1 L.S.
    4" SCHEDULE 40 PVC SANITARY SEWER AND CLEANOUTS     1 L.S.
    5" REINFORCED PCC SIDEWALK & GRANULAR SUBBASE     780 S.F.
    WATER SERVICE     1 L.S.
    ELECTRICAL SERVICE     1 L.S.
    PRECAST CONCRETE 4-HOLE FAMILY SHOWER     1 Each
    ADA SIGNAGE & PAINT STRIPING     1 L.S.
    NEENAH CAST IRON DETECTION PANELS     1 L.S.
    TREE REMOVAL     2 Each
    MOBILIZATION     1 L.S.
Alternate
    PRECAST 2-HOLE PIT LATRINE     1 Each
Alternate
    5" REINFORCED PCC SIDEWALK & GRANULAR SUBBASE     255 S.F.
Alternate
    NEENAH CAST IRON DETECTION PANELS     1 L.S.
Alternate
    ADA SIGNAGE, STRIPING, AND PRECAST WHEEL STOPS     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUENA VISTA -- PROJECT # 18-01-11-01                7/19/2018                Large Project Letting
STORM LAKE
CHAUTAUQUA JETTY REPAIR
Proposal Guarantee: $7,000
Completion Date: 10/11/2018

   This project is designed to repair erosion and stabilize the existing 300' jetty located in Storm Lake (Buena Vista County, IA) at Chautauqua Park. Work includes adding a small amount of macadam stone to get the jetty back to a level grade for the entire length, addition of 1,350 of class "C" fieldstone revetment along the sides for wave and ice protection, and 110 tons of class "A" surfacing for pedestrian fishing access on the top.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    TREE REMOVAL & TRIMMING FOR ACCESS     1 L.S.
    LEVEL GRADING & EXISTING RIP RAP RELOCATION     1 L.S.
    MACADAM STONE     30 Tons
    CLASS 'C' FIELD STONEREVETMENT     1,350 Tons
    CLASS 'A' SURFACING STONE     110 Tons
    SITE RESTORATION & SEEDING     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LINN -- PROJECT # 19-06-57-01                7/19/2018                Large Project Letting
PALISADES-KEPLER
NEW WELL AND WATERMAIN
Proposal Guarantee: $14,000
Completion Date: 5/30/2019

   The project consists of drilling a new well to produce 70 gpm along with installing a new precast building to house pressure tanks and disinfection system. Boring a new 3500 ft. long 2 inch watermain to connect the system to the lodge. Project also include demolishing old structures and plugging 2 existing wells.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLEARING & GRUBBING (ALL SITES)     1 L.S.
    DRILL 14.75" HOLE FROM 0" TO ESTIMATED 40'     40 L.F.
    FURNISH, INSTALL & REMOVE 41' of 13" TEMPORARY CASING     41 L.F.
    GROUT SURFACE CASING WITH EZ SEAL GROUT (ESTIMATED)     5 Each
    DRILL 12.5" DIAMETER HOLE FROM ESTIMATED 40' TO ESTIMATED 200'     160 L.F.
    FURNISH & INSTALL ESTIMATED 200' OF 8" OD X 0.322 WALL, A53B STEEL CASING     200 L.F.
    GROUT EQUIPMENT SETUP     1 L.S.
    FURNISH & INSTALL ESTIMATED 108 SACKS OF NEAT CEMENT GROUT     108 Each
    DRILL 7.875" DIAMETER HOLE FROM 200' TO AN ESTIMATED 400'     200 L.F.
    CLEAN BOTTOM OF WELL OF DEBRIS, AIR LIFT & DEVELOP FOR 1 HOUR     1 L.S.
    FURNISH & INSTALL TEST PUMP AND TEST PUMP WELL     8 HR.
    CHLORINATE WELL, COLLECT GEOLOGICAL SAMPLES & SUBMIT IGS & IDNR REPORTS     1 L.S.
    INSTALL STATIC WATER LEVEL LINE     1 L.S.
    FURNISH & INSTALL 10 HP VARIABLE SPEED SUBMERSIBLE PUMP, CHECK VALVE ETC., & SCHEDULE 80 DROP PIPE, COMPLETE     1 L.S.
    ELECTRIC SERVICE (3 PHASE COPPER) TO WELL IN CONDUIT FROM WELL HOUSE POWER PANEL     1 L.S.
    FURNISH & INSTALL 2" CL 160 PVC WATER LINE WITH #12 TRACER WIRE FROM WELL TO INSIDE OF WELL HOUSE     30 L.F.
    FURNISH & INSTALL A BAKER MONITOR PITLESS UNIT     1 L.S.
    INSTALL WELL BLOW-OFF ASSEMBLY     1 L.S.
WATER TREATMENT BUILDING & DISTRIBUTION 
    GRADING     1 L.S.
 
    10'-6" X 20'-6" PRECAST HUFFCUTT BUILDING (INSTALLED)     1 L.S.
    48" DEEP X 12" WIDE TRENCH FOOTING FOR THE BUILDING AS DESCRIBED IN THE SPECS. INCLUDING EXCAVATION     1 L.S.
    18" DEEP CLASS "A" CRUSHED STONE UNDER THE TREATMENT BUILDING     20 Tons
    EXTEND ELECTRICAL SERVICE TO THE BUILDING FROM EXISTING WELL HOUSE     200 L.F.
    ELECTRICAL SYSTEM COMPLETE FOR TREATMENT BUILDING WITH HEATER, LIGHTS, FAN, ETC.     1 L.S.
    COMPLETE MECHANICAL SYSTEM FOR TREATMENT BUILDING, PROPOTIONAL CHLORINE INJECTION SYSTEM, PRESSURE TANK, MANIFOLD, VALVES, PRESSURE SWITCH, GAUGE, ET     1 L.S.
    2 INCH HDPE DR 11 WATER MAIN BORED WITH #12 TRACER WIRE, AS SHOWN IN THE PLANS     3,500 L.F.
    WATERMAIN CONNECTIONS TO EXISTING LINES, 3 AT RANGERS RESIDENCE & 1 AT LODGE     4 Each
    AIR RELIEF VALVE COMPLETE WITH MANHOLE     1 Each
    DISTRIBUTION SYSTEM DISINFECTION     1 L.S.
DEMOLITION & PLUGGING EXISTING WELLS 
    DEMOLISH EXISTING 8'X10' WELL HOUSE INCLUDING UNDERGROUND PIT NEAR PARK OFFICE & DISPOSAL     1 L.S.
 
    REMOVE EXISTING PUMP, PLUG WELL -WELL DEPTH 185' (NEAR OFFICE)     1 L.S.
    REMOVE PRESSURE TANK, DEMOLISH 10'X16' CONCRETE STRUCTURE & DISPOSAL     1 L.S.
    REMOVE EXISTING PUMP, PLUG WELL -WEL DEPTH 632' (NEAR LODGE)     1 L.S.
    SEED, FERTILIZE & MULCH ALL DISTURBED AREAS (WHOLE PROJECT)     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WEBSTER -- PROJECT # 15-02-94-08                7/19/2018                Large Project Letting
BRUSHY CREEK RECREATION AREA
BOONE FORKS BOAT RAMP
Proposal Guarantee: $5,000
Completion Date: 5/30/2019

   THIS PROJECT CONSISTS OF INSTALLING A PORTLAND CEMENT CONCRETE CANOE RAMP, ON THE BOONE RIVER LOCATED IN WEBSTER COUNTY, IOWA AND INCLUDES GRADING, PLACING RIPRAP ALONG RIVER BANKS, AND INSTALLING REINFORCED PORTLAND CEMENT CONCRETE CANOE ACCESS RAMP ONTO THE BOONE RIVER.

ESTIMATED QUANTITIES:
    CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    SUBGRADE PREPARATION     120 S.Y.
    GRANULAR SUBBASE     28.4 Tons
    CLASS ‘A’ CRUSHED STONE     176 Tons
    MACADAM STONE     13 Tons
    CRUSHED BRICK CHIPS     65 Tons
    CLASS ‘D’ RIPRAP     500 Tons
    GROOVED REINFORCED PCC CANOE LAUNCH RAMP     44.5 S.Y.
    6-INCH REINFORCED PCC PAVEMENT     100 S.Y.
    8-INCH FILTER SOCK     100 L.F.
    SEEDING, FERTILIZING AND MULCHING     0.2 Acres
    STEEL BEAM GUARDRAIL W-BEAM SECTIONS     2 Each
    STEEL BEAM GUARDRAIL END ANCHOR, W-BEAM     4 Each
    SIGNAGE     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 17-04-88-03                6/21/2018                Small Project Letting
GRAND RIVER WILDLIFE UNIT
3 MILE MARINA PCC BOAT RAMP REPAIR
Proposal Guarantee: $0
Completion Date: 9/30/2018

   This project consists of PCC boat ramp dock access removal/replacement and PCC partial depth repair.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




CASS -- PROJECT # 18-04-15-01                6/28/2018                Small Project Letting
LAKE ANITA STATE PARK
CHECK-IN KIOSK
Proposal Guarantee: $0
Completion Date: 10/19/2018

   This project will consist of the construction of a new check-in kiosk at the Lake Anita State Park campground area. The kiosk shall be made from nominal lumber which is cedar-tone treated as shown in the drawings. There shall be a concrete slab and concrete footings for the kiosk as shown.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




DELAWARE -- PROJECT # 18-06-28-02                6/28/2018                Small Project Letting
MAQUOKETA WILDLIFE UNIT
TAKES WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 9/28/2018

   This project will restore the Takes Wetlands area west of Buffalo Creek, northwest of Coggon, Iowa. The project includes constructing an approximately 1,145-feet long, 3-4' high berm with material on-site, an overflow structure and a water control structure per plans and NRCS Specifications.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




LUCAS -- PROJECT # 18-05-59-02                6/28/2018                Small Project Letting
STEPHENS STATE FOREST
SOUTH POND OUTLET REPLACEMENT
Proposal Guarantee: $0
Completion Date: 11/21/2018

   This project consists of removal of a 18" CMP riser and replacing with a 4'x4' concrete riser with sluice gate. The existing 12" CMP conduit will be lined with Innerflow HDPE liner. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




DECATUR -- PROJECT # 19-05-27-01                7/5/2018                Small Project Letting
NINE EAGLES STATE PARK
SILT PONDS REPAIRS
Proposal Guarantee: $0
Completion Date: 11/30/2018

   This project consists of repairing 2 dam washouts, replacing one 24" CMP, clearing trees from 3 dams, and other miscellaneous related work. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




JASPER -- PROJECT # 19-05-50-01                7/5/2018                Small Project Letting
ROCK CREEK STATE PARK
PIT VAULT LATRINE AT NW BOAT RAMP
Proposal Guarantee: $0
Completion Date: 11/21/2018

   Install a single hole precast concrete pit restroom building. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




MARION -- PROJECT # 19-05-63-01                7/5/2018                Small Project Letting
ELK ROCK STATE PARK
BOAT RAMP/INTERSECTION CONCRETE ADDITIONS
Proposal Guarantee: $0
Completion Date: 10/26/2018

   This project consists of a 36 CY concrete addition adjacent to the boat ramp. Also, a 8 CY concrete addition to an intersection radius. Construction window is between September 4 and October 26, 2018. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




WARREN -- PROJECT # 19-05-91-01                7/5/2018                Small Project Letting
LAKE AHQUABI STATE PARK
SHORELINE RIPRAP BEACH TO FISH HOUSE
Proposal Guarantee: $0
Completion Date: 11/21/2018

   This project is for the placement of riprap and erosion stone between the beach and fish house at Lake Ahquabi State Park. Stone will be placed over engineering fabric. Construction window is from August 23 to November 21 excluding weekends and state holidays. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




FREMONT -- PROJECT # 19-04-36-01                7/12/2018                Small Project Letting
WAUBONSIE
POOL REMOVAL
Proposal Guarantee: $0
Completion Date: 10/4/2018

   This project involves removal of the swimming pool at Waubonsie State Park and any incidental work as required by the D.N.R Field Engineer in Fremont County. IA Remove existing swimming pool, concrete pool deck, fence, lighting, underground piping and other items used for the pool. The underground water supply piping shall be disconnected and capped in the manhole at the NW corner of the pool. All lights and poles shall be removed in there entirety except the one in the NW corner with the electrical panel and it should be cut off above the panel as the panel is to remain. When evertything is removed the earth banks on the east and south side shall be moved to the north and west side to make a 4:1 slope and the remainder of the area shall be shaped to drain. Contractor will be responsible for materials and equipment stored on site. Site Restoration required for all disturbed areas. Proposal may be obtained by e-mailing name, address, and phone number.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




MONTGOMERY -- PROJECT # 19-04-69-01                7/12/2018                Small Project Letting
VIKING LAKE
SILT POND REPAIRS
Proposal Guarantee: $0
Completion Date: 10/4/2018

   Repair Silt Dike- Viking Lake State Park, Montgomery County, Iowa. This project involves replacement of the outlet pipe on a silt pond at Viking Lake State Park and any other incidental work as required by the D.N.R Field Engineer in Montgomery County. IA The existing dike has a watermain that can NOT be disturbed. Brush removal is required on the pond dike and brush will be piled on the NW side of the pond. The new 8" diameter smooth metal pipe shall have 2 anti-seep colars installed as shown on the drawing. The new 8"diameter pipe shall have a canopy inlet installed on the pipe. The canopy inlet shall be incidental to the new pipe and not paid separately. Reshaping the washed out area on the outlet of the emergency spillway is required and this shall be incidental to the clearing and grubbing item and not paid separately. Contractor will be responsible for materials and equipment stored on site. Site Restoration required for all disturbed areas. Proposal may be obtained by e-mailing name, address, and phone number.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov