The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual. Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms, Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.
Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis.
To subscribe to this list, click here.
The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.
To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website.
You may obtain a free download from
Plans can be ordered by following this link: http://bit.ly/IADNRPlans
|
|
CLARKE -- PROJECT # 18-05-20-01 6/14/2018 Small Project Letting
|
WEST LAKE OSCEOLA
|
BOAT RAMP EXTENSION WITH ARTICULATING CONCRETE BLOCK (ACB) |
Proposal Guarantee: $0
|
Completion Date: 9/1/2018
|
| This project consists of extension of an existing concrete boat ramp by use of articulated concrete blocks (ACB).
Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
UNION -- PROJECT # 17-04-88-03 6/21/2018 Small Project Letting
|
GRAND RIVER WILDLIFE UNIT
|
3 MILE MARINA PCC BOAT RAMP REPAIR |
Proposal Guarantee: $0
|
Completion Date: 9/30/2018
|
| This project consists of PCC boat ramp dock access removal/replacement and PCC partial depth repair.
|
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
|
|
CASS -- PROJECT # 18-04-15-01 6/28/2018 Small Project Letting
|
LAKE ANITA STATE PARK
|
CHECK-IN KIOSK |
Proposal Guarantee: $0
|
Completion Date: 10/19/2018
|
| This project will consist of the construction of a new check-in kiosk at the Lake Anita State Park campground area. The kiosk shall be made from nominal lumber which is cedar-tone treated as shown in the drawings. There shall be a concrete slab and concrete footings for the kiosk as shown.
|
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
|
|
DELAWARE -- PROJECT # 18-06-28-02 6/28/2018 Small Project Letting
|
MAQUOKETA WILDLIFE UNIT
|
TAKES WETLAND RESTORATION |
Proposal Guarantee: $0
|
Completion Date: 9/28/2018
|
| This project will restore the Takes Wetlands area west of Buffalo Creek, northwest of Coggon, Iowa. The project includes constructing an approximately 1,145-feet long, 3-4' high berm with material on-site, an overflow structure and a water control structure per plans and NRCS Specifications.
|
Contact: Michael Dufoe 515-985-9196 Michael.dufoe@dnr.iowa.gov
|
|
LUCAS -- PROJECT # 18-05-59-02 6/28/2018 Small Project Letting
|
STEPHENS STATE FOREST
|
SOUTH POND OUTLET REPLACEMENT |
Proposal Guarantee: $0
|
Completion Date: 11/21/2018
|
| This project consists of removal of a 18" CMP riser and replacing with a 4'x4' concrete riser with sluice gate. The existing 12" CMP conduit will be lined with Innerflow HDPE liner.
Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
DECATUR -- PROJECT # 19-05-27-01 7/5/2018 Small Project Letting
|
NINE EAGLES STATE PARK
|
SILT PONDS REPAIRS |
Proposal Guarantee: $0
|
Completion Date: 11/30/2018
|
| This project consists of repairing 2 dam washouts, replacing one 24" CMP, clearing trees from 3 dams, and other miscellaneous related work. Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
JASPER -- PROJECT # 19-05-50-01 7/5/2018 Small Project Letting
|
ROCK CREEK STATE PARK
|
PIT VAULT LATRINE AT NW BOAT RAMP |
Proposal Guarantee: $0
|
Completion Date: 11/21/2018
|
| Install a single hole precast concrete pit restroom building.
Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
MARION -- PROJECT # 19-05-63-01 7/5/2018 Small Project Letting
|
ELK ROCK STATE PARK
|
BOAT RAMP/INTERSECTION CONCRETE ADDITIONS |
Proposal Guarantee: $0
|
Completion Date: 10/26/2018
|
| This project consists of a 36 CY concrete addition adjacent to the boat ramp. Also, a 8 CY concrete addition to an intersection radius.
Construction window is between September 4 and October 26, 2018.
Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
WARREN -- PROJECT # 19-05-91-01 7/5/2018 Small Project Letting
|
LAKE AHQUABI STATE PARK
|
SHORELINE RIPRAP BEACH TO FISH HOUSE |
Proposal Guarantee: $0
|
Completion Date: 11/21/2018
|
| This project is for the placement of riprap and erosion stone between the beach and fish house at Lake Ahquabi State Park. Stone will be placed over engineering fabric. Construction window is from August 23 to November 21 excluding weekends and state holidays.
Send an email to request plans.
|
Contact: Jason Kruse (515) 250-3707 jason.kruse@dnr.iowa.gov
|
|
FREMONT -- PROJECT # 19-04-36-01 7/12/2018 Small Project Letting
|
WAUBONSIE
|
POOL REMOVAL |
Proposal Guarantee: $0
|
Completion Date: 10/4/2018
|
| This project involves removal of the swimming pool at Waubonsie State Park and any incidental work as required by the D.N.R Field Engineer in Fremont County. IA
Remove existing swimming pool, concrete pool deck, fence, lighting, underground piping and other items used for the pool. The underground water supply piping shall be disconnected and capped in the manhole at the NW corner of the pool. All lights and poles shall be removed in there entirety except the one in the NW corner with the electrical panel and it should be cut off above the panel as the panel is to remain. When evertything is removed the earth banks on the east and south side shall be moved to the north and west side to make a 4:1 slope and the remainder of the area shall be shaped to drain.
Contractor will be responsible for materials and equipment stored on site.
Site Restoration required for all disturbed areas.
Proposal may be obtained by e-mailing name, address, and phone number.
|
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
|
|
MONTGOMERY -- PROJECT # 19-04-69-01 7/12/2018 Small Project Letting
|
VIKING LAKE
|
SILT POND REPAIRS |
Proposal Guarantee: $0
|
Completion Date: 10/4/2018
|
| Repair Silt Dike- Viking Lake State Park, Montgomery County, Iowa.
This project involves replacement of the outlet pipe on a silt pond at Viking Lake State Park and any other incidental work as required by the D.N.R Field Engineer in Montgomery County. IA
The existing dike has a watermain that can NOT be disturbed.
Brush removal is required on the pond dike and brush will be piled on the NW side of the pond.
The new 8" diameter smooth metal pipe shall have 2 anti-seep colars installed as shown on the drawing.
The new 8"diameter pipe shall have a canopy inlet installed on the pipe.
The canopy inlet shall be incidental to the new pipe and not paid separately.
Reshaping the washed out area on the outlet of the emergency spillway is required and this shall be incidental to the clearing and grubbing item and not paid separately.
Contractor will be responsible for materials and equipment stored on site.
Site Restoration required for all disturbed areas.
Proposal may be obtained by e-mailing name, address, and phone number.
|
Contact: Mark Johnson 515-250-3713 mark.johnson@dnr.iowa.gov
|