High levels of 1,2-Dichloroethene, 2-Butanon (MEK), Acetone, Benzene, Toluene, Ethylbenzene, Methyl Chlroide, Naphthalene, and Xylene identified in the former underground tank area at the site. The RP is in the process of bringing the groundwater extraction system running.