Fee: First 1,000 feet: $100.00 Next 19,000 feet: $0.10/ft. Next 300,000 feet: $0.01/ft. Over 320,000 feet: No additional charge
This fee is based only on the length of the water main in the project but covers all aspects of water main construction (i.e. hydrants, valves, tapping sleeves, bends, thrust blocks, fittings, etc.)
$
Fee: First $50,000: $100.00 Next $950,000: 0.2% of estimated construction cost Next $14,000,000: 0.1% of estimated construction cost Over $15,000,000: No additional charge
This fee covers all other water supply construction (e.g. wells, treatment plants, storage tanks, pump stations, etc.)
If yes, also complete, “WATER MAINS” and “OTHER WATER SUPPLY RELATED CONSTRUCTION” above
If yes, Additional As-Built Construction Fee: $200.00
Extensions may only be requested within one year of the permit issuance date. If more than one year has elapsed and construction has not commenced, a new permit application is required; resubmittal of plans and specifications may not be necessary under certain conditions.
If yes, Request for Time Extension Fee: $50.00
Fee: $0.10 per foot of additional water main (Minimum fee = $50)
Fee: 0.2% of additional non-water main related construction costs (Minimum fee = $50)
Maximum Annual Fee: $5,000
Maximum Annual Fee: $16,000
Calculated Fees to be paid:
Reduction To Annual maximum:
Total Fees Due: