5/26/2021 A site separation survey request is warranted for the IPL-Ottumwa Generation Station in accordance with the IWFDS Chapter 64 section 64.2(3)a-f for the UV construction with Project reference # 2021-0384A. Thank you for your assistance. THABIT HAMOUD
Request Files
File Name File Type File Date
Work Request Resolution
Report
Document Name Type File Date Note
ottumwa gen site survey ROI 6-2021.pdf
Inspection Report (public)
06/02/2021 OGS site survey ROI 6-2021
File Name File Type File Date Note
Comments
6/2/2021 Rob Saunders provided drawings and a descriptive summary of plans to place a lined low volume pon in the location of the existing zero discharge pond and install new UV system within the existing Advantix WW system building. Since both improvements will be within the existing ww footprint, they would meet the 90% rule and separation criteria will be satisfied. See attached ROI survey. TERRY JONES