Field Office Compliance - Work Request


Work Request ID - 2347
Neal South Energy Center - Midamerican - 310379772
2761 PORT NEAL CIRCLE Salix, IA 51052
Woodbury County

FO 3

Describe Request
8/23/2013 MidAmerican Energy Neal North site is completing Cell #2 and would like an inspection. They are not totally done with construction. Some inspectors like to see the liner before the drainage layer. Please contact Jenny Coghlin @ 281-2344 for setting up a time to inspect. NINA KOGER
Request Files
File Name File Type File Date
Work Request Resolution
Report
File Name File Type File Date Note
Comments
10/21/2013 On 10/17/2013 I met with Mike Carr, PE for DGR Engineering, and with Mid American personnel Jenny Coughlin, Terry Klemme, Dave Healy and Tami Chrisman at the Neal North Cell #2 construction site. I was given a tour and the construction process was explained to me. The cell is finished besides a couple of minor touch-ups on the road, seeding mats, etc. They are also waiting on a flow meter for the leachate pump which is fully operational without. From what could be seen, the liner system and leachate control system appeared in sound condition and ready for use. JENNIFER CHRISTIAN
Compliance Tracking
Action Type Date Completed Date Comment Delete
"
"