Field Office Compliance - Field Activity - 39835


Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Activity Report
Document Name Type File Date Note
Magellan Des Moines Terminal - Proposed Shut Down NE Area.pdf
Inspection Report (public)
11/17/2010 Letter approving trial termination of remediation systems in NE Area dated 1/12/2011
File Name File Type File Date Note
Comments
1/12/2011 On January 12, 2011 we sent a response letter approving the trial termination (shut down) of all remediation systems in the Northeast Area (Air Sparging wells and Air Lift Circulation Trench). There will be monitoring of three sentinel wells up-gradient west of the Air Lift Circulation Trench and three down-gradient trigger wells east of the Air Lift Circulation Trench (details of monitoring in attached letter). BILL GIBBONS
12/30/2010 On December 13, 2010 we received the Semi-Annual monitoring report (April 2010 through September 2010). Included in the report was the proposal to shut down all remediation systems in the Northeast Area including the Air Sparging (bio sparging) in the MPE wells and the Air Lift Circulation (ALC) Trench. The wording in the report was to conduct a trial termination of AS operations in the Northern Area. I wanted to clarify that this meant shut down of all MPE wells (AS) and shut down the ALC Trench. On December 30, 2010 I called Terry Cochran with Apex Companies, LLC who is at the Tulsa, OK office and confirmed with him that they were proposing a total shut down of all remediation systems in the Northeast Area. We also discussed when the systems would be shut down. I told him a response letter would be coming from us in January and if we approved their proposal when would they shut down the remediation systems? Terry said they would shut down the systems almost immediately after approval to do so. I asked about the additional monitoring well which would be installed as a sentinel well east of the ALC Trench as to when they planned on installing it. I asked if they would have it installed before the March sampling event. He said they could try to do so but it would hinge on getting approval for access on Mid American Energy property. BILL GIBBONS
11/30/2010 On November 17, 2010 Dennis Appelhons and I went to the Magellan Des Moines Terminal to meet with Tristan Grover (Environmental Specialist with Magellan), Steve Steward (Area Supervisor with Magellan), Dave Hruby (Apex), a representative of TRC (handling remediation project for Magellan), and Lorraine Woxell (Environmental - Home office for Magellan). The meeting was called to review the remediation projects currently underway at the Magellan Des Moines Terminal including the northeast area, southern area, and free product recovery at the truck loading rack. The main topic of the meeting was TRC's proposal to shut down all remediation systems in the northeast area (as has been done in the southern area) and go to a monitoring phase to see if contaminant levels will remain (stable) after shut down and if they will meet the agreed to clean up goals without further active remediation. We told them to submit a proposal with the upcoming bi-annual monitoring report and we would review it and give them a written response. BILL GIBBONS
Compliance Tracking
Action Type Date Completed Date Comment Delete