Field Office Compliance - Field Activity: Staff Action ID - 36358


Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Activity Report
File Name File Type File Date Note
Comments
3/29/2010 On Tuesday, March 16, 2010 at 8:30 AM I talked to Tristan Grover with Magellan. He said they advanced thirteen geoprobe wells around the location of where the leak was found and have defined the thickness and lateral extent of the free product plume. The leak was about 60’ south (3 sets of dead legs south) of the excavation area near recovery well 3. Apex has developed a free product recovery plan that will be a system of recovery wells placed in the free product plume. Tristan set up a meeting between Dave Hruby with Apex and Steve Steward with Magellan to discuss the free product recovery plan on Thursday, March 25, 2010 at 9:00 AM). BILL GIBBONS
3/29/2010 On Monday, March 15, 2010 at 8:00 AM I talked to Tristan Grover with Magellan. He told me they found the location of the leak at the second set of dead legs south of the excavation near recovery well 3. The leak was in one of the dead legs (old piping coming off the main pipeline which supplied the former truck loading rack). They will bring a geoprobe unit out tomorrow (Tuesday, March 16, 2010) and work to define free product plume in terms of thickness and the lateral extent. They are now recovering product from the trench dug near recovery well three because the water table came up. BILL GIBBONS
3/9/2010 I made another visit to the Magellan Terminal in Pleasant Hill yesterday (Monday, March 8, 2010) at 1:00 PM. I met with Tristan Grover, the area supervisor Steven Steward, the Operations Supervisor Rodger Teasdale, and David Hruby with Apex. They were able to uncover two sections of the pipeline the first near recovery wells 1 and 2 (near north end of pipeline) and the second opening near recovery well 3 (about 30’ south or recovery wells 1 & 2). Recovery well 3 is were they are finding fresh product. Where they excavated around recovery well 3 they did have some infiltration of free product into the hole at a depth of about 20’. The water table is quite low right now so they plan on excavating deeper in this area to see if they can reach the water table and get free product to come into the trench with ground water. They have also cut a section out of the pipeline in the excavation near recovery well 3 and sealed off both ends of the pipe. They had pressure tested the entire pipe and it would not hold pressure. They will test the line south of the cut out to see if it holds pressure; if not they will dig out another section to the south (about 100’ south) and remove another section of pipe and try again. In this manner they are working to isolate where the leak occurred. Once the leak is located they will bring in a geoprobe unit to define the extent of the free product plume. They are going to run the second pressure test Tuesday, March 9, 2010 and let me know what the result is. BILL GIBBONS
Compliance Tracking
Action Type Date Completed Date Comment Delete