Field Office Compliance - Field Activity - 59358


Winnebago Industries, Inc - Forest City - 310270292
605 W CRYSTAL LAKE RD Forest City, IA
Winnebago County

FO 2

Activity Report
Document Name Type File Date Note
Winnebago Industries - Forest City (2016-02-18) Air Quality Inspection.pdf
Inspection Report (public)
02/18/2016 2-18-2016 Air Quality Inspection
Winnebago Industries - Forest City (2016-03-10) written response to inspection.pdf
Inspection Report (public)
02/18/2016 3-10-2016 written response to inspection
Winnebago Industries - Forest City (2016-08-30) response regarding stack heights.pdf
Inspection Report (public)
02/18/2016 8-30-2016 response regarding EP discrepancies
Winnebago Industries - Forest City (2017-01-25) determination letter regarding stack heights.pdf
Inspection Report (public)
02/18/2016 1-25-2017 AQB determination letter
Winnebago Industries - Forest City (2017-02-20) RE to compliance plan.pdf
Inspection Report (public)
02/18/2016 2-20-2017 AQB acceptance of compliance plan
Winnebago Industries - Forest City (2017-06-19) stacks modified.pdf
Inspection Report (public)
02/18/2016 6-19-2017 e-mail stating that the stacks had been modified.
File Name File Type File Date Note
Comments
6/22/2017 E-mail from Wayne Venzke on 6/19/17 stating that the stacks had been modified to match permit conditions. GLENN CARPER
6/8/2017 Permit amendments for the six EPs (951-S01, 952-S01, 970-E01, 981-D01, 981-D03, 987-E01) were issued on 6/8/17. GLENN CARPER
5/11/2017 The permit application package to modify the stack conditions for the six EPs was received on 3/22/17. GLENN CARPER
2/20/2017 Compliance plan acceptance letter from AQB on 2/20/17. Permits for 6 EPs will be amended to reflect as-built conditions (951-S01, 952-S01, 970-E01, 981-D01, 981-D03, 987-E01). Amendment requests to be received by 4/1/17. Eight stacks will be modified to match current permit conditions (951-O03,979-G02, 979-G06, 979-S01, 979-S03, 979-S05, 979-S10, 979-S11). These stacks will be modified by 8/1/17. GLENN CARPER
1/27/2017 Determination letter issued by AQB on 1/25/17. Fourteen emission points will either need to be modified to match the permit characteristics, or the permits will need to be modified. Winnebago is to develop a compliance plan for doing this. No deadline established. GLENN CARPER
12/1/2016 Project 16-423 was received on 11/1/16. GLENN CARPER
8/30/2016 A letter was submitted by Wayne Venzke on 8/30/16 with an attachment that detailed all the emission point discrepancies discovered at the facility. Mr. Venzke stated that permit amendment requests to modify emission point characteristics would be submitted by 11/1/16. GLENN CARPER
5/19/2016 I contacted Wayne Venzke via e-mail on 5/19/16 to inquiry about the status of permit amendments. he stated that they are gathering info on stack locations and the characteristics listed in the permits and will provide this to the contractor. The contractor will then verify the as-built characteristics of all the stacks. This will be completed by 9/1/16. Permit amendment applications, if necessary, will be submitted shortly thereafter. GLENN CARPER
3/15/2016 Winnebago submitted a written response on 3/10/16. The two oven stacks were measured. The height of 951-O05-P matched what was in its permit. However, the height of 951-O03-P was 8.1 feet higher than what was listed in its permit. Winnebago will be requesting a permit modification to correct the stack height. They will also high a consultant to verify the emission point characteristics of all emission points at the facility. Permit amendments will be requested where necessary. GLENN CARPER
2/26/2016 Conducted air quality inspection on 2/18/16. No deficiencies. Did list one required action - measure the heights of the oven stacks for the vertical paint system (permits list a 9 foot difference in height, but they look the same from the ground). Also two recommendations - list duration of visible emissions observations for the sawmill dust collectors when the pressure drop is outside the range and recommended checking the emission point characteristics of all the stacks at the facility. GLENN CARPER
Compliance Tracking
Action Type Date Completed Date Comment Delete