Field Office Compliance - Complaint


Complaint ID - 36062
Dyersville City Of Stp - 310648987
Dyersville, IA 52040
Dubuque County

FO 1

Complaint ID:
36062
Complainant
(L)
Complaint Location
  • Sec:
  • Tier:
  • Range:
  • Lat:
  • Long:
Complaint Resolution
Responsible Party
Report
Document Name Type File Date Note
36062_030426_01.pdf
Facility Response (public)
03/02/2026 3rd St LS - 2 pumps
36062_030426_02.pdf
Facility Response (public)
03/02/2026 Asset map
36062_030426_03.pdf
Facility Response (public)
03/02/2026 Dec Maintenance record
36062_030426_04.pdf
Facility Response (public)
03/02/2026 Dyersville PD - 2 Call for Service Records - 2025-12-13
36062_030426_05.pdf
Facility Response (public)
03/02/2026 Jan Maintenance record
36062_030426_06.pdf
Facility Response (public)
03/02/2026 Manhole 358
36062_030426_07.pdf
Facility Response (public)
03/02/2026 Manhole 2048
36062_030426_08.pdf
Facility Response (public)
03/02/2026 MH 358 Inspection
36062_030426_09.pdf
Facility Response (public)
03/02/2026 MH 2048 Inspections
36062_030426_10.pdf
Facility Response (public)
03/02/2026 Nov maintenance record
36062_030426_11.pdf
Facility Response (public)
03/02/2026 Sewer main 361
36062_030426_12.pdf
Facility Response (public)
03/02/2026 task 62417 Lift Station call in
File Name File Type File Date Note
Comments
3/4/2026 Received maintenance records requested. Attached. Sent to Savannah Salow for her records. No significant violations noted. This compliant will be closed. MICHELE SMITH
3/3/2026 From 0851 to 0926, spoke with Savannah and her husband following the meeting with Dyersville staff. Relayed the information noted, as well as discussed standard requirements for reporting bypasses. Sent link to FOCD. MICHELE SMITH
3/3/2026 Spoke with Joe Reicher, OIC, John Wandsnider, PWD, Terry Menke, Operator, and Tim Herbers, Operator on 3-3-2026 from 0810 to 0843. Determined the following:1. The 3rd St lift station had an electrical issue in December 2025. Although it has the capacity to hold three pumps, only two have been necessary based on flow. One pump was damaged and sent in for repair and was gone for about one month. Currently the LS is operating as usual, with two pumps. This LS has been approved for an overhaul and a third pump will be installed based on increased flows.2. The LS is checked every Monday. Grease and trash are cleaned out at least monthly.3. A single barrel siphon is present in this area. It was built in 1964 and met design standards at that time. The city is evaluating the feasibility of replacing this with a double barrel siphon. Because of the different design of this siphon, current staff were not aware of its presence until recently. 4. Although cameras cannot be used to inspect siphon lines, a visual inspection of the manholes is done. 5. Line was last cleaned in 2020. Scheduled to be cleaned in 2023, but staff ran out of time and was not done.6. Pertinent documents were requested at the conclusion of the phone meeting. MICHELE SMITH
3/2/2026 Sent Savannah Salow copies of bypass reports, inspection, permit for her records. MICHELE SMITH

Compliance Tracking
Action Type Date Completed Date Comment Delete