Field Office Compliance - Complaint


Complaint ID - 18574
Regional Collection Center - 316124584
1105 PRAIRIE DR. SW Bondurant, IA 50035
Polk County

FO 5

Complaint ID:
18574
Complainant
(L)
Complaint Location
  • Sec:
  • Tier:
  • Range:
  • Lat:
  • Long:
Complaint Resolution
Responsible Party
Report
File Name File Type File Date Note
Comments
11/19/2014 From: Gastineau, Janet [DNR] Sent: Tuesday, November 18, 2014 2:06 PM To: 'Kevin Meredith' Cc: Petersen, Ted [DNR]; '[email protected]'; '[email protected]' Subject: RE: MWA in Bondurant information Ted Petersen let me know you brought in more information but it seemed to focus predominantly on historic storm water issues. We agreed I would pursue past effluent data from the wetland, but could otherwise close the wastewater complaint. I am hoping to obtain effluent quality data which will better speak to the effectiveness of the wetland, regardless of the conditions depicted in the aerial photograph. My interest in the 2012 documentation provided is to confirm the new system, which replaced the wetland, was reviewed and permitted by Polk County and that it is non-discharging. The new on-site system was installed and appears to be functioning properly. I will check with Polk County and other DNR staff to determine if the original design was reviewed and get back to you. JANET GASTINEAU
11/19/2014 From: Gastineau, Janet [DNR] Sent: Wednesday, November 19, 2014 10:39 AM To: '[email protected]' Cc: Petersen, Ted [DNR]; [email protected]; '[email protected]'; [email protected] Subject: RE: MWA in Bondurant information There was no deadline for submission but I was under the impression the information you brought to the office last week was your next step…Attached is a copy of the 10/21/1994 Polk County approval of the on-site wastewater system. Results of analysis from 2007-2011 are also attached. JANET GASTINEAU
11/19/2014 From: Kevin Meredith [mailto:[email protected]] Sent: Tuesday, November 18, 2014 1:51 PM To: Gastineau, Janet [DNR] Cc: Petersen, Ted [DNR]; [email protected] Subject: FW: MWA in Bondurant information Attached is our input we were working on finalizing. We did not know you had set a deadline for submission. We ask that your reconsider your decision to close our complaint before all the issues are resolved. Thanks, J. Kevin Meredith, P.E., LEED AP Mechanical Engineer From: Kevin Meredith Sent: Tuesday, November 18, 2014 1:37 PM To: 'Gastineau, Janet [DNR]' Cc: Petersen, Ted [DNR] ([email protected]); [email protected] Subject: RE: MWA in Bondurant information You closed out the complaint without ever receiving my response? You do realize that the existing system had no water in it for years, hence no bacteria , no plants and hence no treatment. The biannual performance testing was done > 20 feet away from the discharge across a sandy bare patch of ground? This issue was raised with Snyder and Associates last night. Who also stated these systems don’t work in winter because they freeze and the bacteria dies. Did the original design ever get reviewed by someone other than Snyder and Associates? Here’s the wetland in 2011. Really does not look like a wetland to me. Does it to you? You still appear to focus exclusively only on the 2012 design. Our complaint is still open with the EPA. JANET GASTINEAU
11/19/2014 From: Gastineau, Janet [DNR] [mailto:[email protected]] Sent: Tuesday, November 18, 2014 1:24 PM To: Kevin Meredith Cc: [email protected] Subject: FW: MWA in Bondurant information Additional information regarding the new mound system. I have closed out the complaint as it relates to the on-site wastewater system and understand the storm water portion of your complaints have been assigned to Dave Perry in the field office. When Judy comes up with effluent quality results I will forward them to you. I could not get the first document to open. From: Dave Williamson [mailto:[email protected]] Sent: Tuesday, November 18, 2014 10:32 AM To: Gastineau, Janet [DNR] Subject: MWA in Bondurant information Please see below Dave Williamson Polk County Sent from my iPhone Begin forwarded message: From: "Randy Banks" [email protected] To: "Dave Williamson" [email protected] Dave, Here is the paperwork that you are asking for. If there’s anything more that you might need let me know. Randy Banks Polk County Public Works Code Enforcement Officer Environmental Health 5885 NE 14th Street Des Moines, Ia 50313 PH- 515-286-2269 Fax- 515-286-3437 JANET GASTINEAU
11/12/2014 From: Gastineau, Janet [DNR] Sent: Wednesday, November 12, 2014 9:34 AM To: 'Dave Williamson' Subject: RE: 1105 Prairie Drive Thank you. We were investigating the site following a complaint. It appears the complainant is primarily concerned with a period of time from 2008-2010, so the wetland system would have been in operation. The complainant is assembling additional information to submit to us and the collection center is also trying to get their hands on effluent data from that time period. I appreciate knowing staff is working on providing us with a copy of the permit for the new system. From: Dave Williamson [mailto:[email protected]] Sent: Wednesday, November 12, 2014 9:03 AM To: Gastineau, Janet [DNR] Cc: Randy Banks; Bret Vandelune Subject: 1105 Prairie Drive Janet, I wanted to follow up with from our phone conversation last week. Staff is compiling the file to forward onto you. It should be available in the near future. To answer your specific question. It is an at grade pressurized sand mound system. Staff advises that it is not a discharging type. David A. Williamson Housing Services/Code Enforcement Manager Planning/Development Division Polk County Public Works Department 5885 NE 14th Street Des Moines, Iowa 50313 515-286-3726 (office) [email protected] JANET GASTINEAU
11/7/2014 From: Gastineau, Janet [DNR] Sent: Friday, November 07, 2014 8:37 AM To: '[email protected]' Cc: '[email protected]'; Petersen, Ted; [email protected] Subject: Metro Waste HHW collection center/complaint #18574 I visited the site this week and am waiting on Polk County to send me a copy of the permit for the new onsite wastewater system, which is reported as non-discharging. The previous system was permitted through the Polk County and through the Iowa DNR (General Permit #4) for discharge from an onsite wastewater treatment and disposal system. The manager of the HHW provided me with results from one sample collected from the former treatment system from April 2012. The results of analysis for total suspended solids and CBOD5 were less than the expected secondary treatment standards or effluent quality limits of GP4 and are attached. Through GP4 sampling was required no less than 2/year at six month intervals. The system was replaced due to an expansion of the parking areas, access, and storage facilities for the collection center. The facility’s pollution prevention plan, as it relates to the expansion project through storm water general permit #2, is attached. The onsite wastewater system serves sanitary waste from a few sinks and the restroom facility, which is for employees only. If spills were to occur in the covered collection center, flow would be to containment which is pumped out for disposal. According to two members of the HHW collection center staff the wetland rarely discharged and the storm water detention basin on site rarely discharged through the overflow to the ditch to the west. If you are interested in additional sample results I can pursue these with the facility. The new non-discharging system has been in operation for approximately two years. The constructed wetland is visible in one of the other attachments. Please let me know what, if any, additional information we can provide to address your concerns. JANET GASTINEAU
11/5/2014 LEFT A MESSAGE FOR THE FACILITY MANAGER, JUDI MENDENHALL. LEFT A MESSAGE FOR DAN OLSON WITH THE IOWA DNR TO SEE WHAT HE KNOWS ABOUT THE SYSTEM. ACCORDING TO ART THEY SAMPLED THE EFFLUENT FROM THE OLD SYSTEM TWICE/YEAR FOR THE DNR, SO MAYBE DAN HAS DATA. CALLED POLK COUNTY WHO AGREED TO SEND ME A COPY OF THE CONSTRUCTION PERMIT FOR THE NEW SYSTEM. JANET GASTINEAU
11/5/2014 VISITED SITE AND MET WITH ART KERN WHO WALKED ME THROUGH THE OLD SYSTEM (REMOVED) AND THE NEW. THE OLD SYSTEM WAS REMOVED TO ACCOMODATE AN EXPANSION OF PARKING AND BUILDINGS FOR STORAGE. THE NEW SYSTEM IS GRAVITY FLOW TO TANKS WHICH PUMP TO ONE OF THREE MOUND SYSTEMS. JANET GASTINEAU

Compliance Tracking
Action Type Date Completed Date Comment Delete