Field Office Compliance - Complaint


Complaint ID - 26817
Waterloo City Of Stp - 310652027
3505 EASTON AVENUE Waterloo, IA 50702
Black Hawk County

FO 1

Complaint ID:
26817
Complainant
(L)
Complaint Location
  • Sec:
  • Tier:
  • Range:
  • Lat:
  • Long:
Complaint Resolution
Responsible Party
Report
File Name File Type File Date Note
Comments
5/15/2019 Chlorine tablets are placed in the in the exit hole daily in an attempt to disinfect the bypass flow. MATT CALVERT
5/15/2019 Met with Steve Hoambrecker, Waste Management Services Director, and he mentioned that the Cattle Congress force main break has been more difficult to fix that first anticipated. Originally it was thought that the force main was a few to five feet deep, but in reality it is eighteen feet deep. The city has contacted the Corps of Engineers about fixing this break on the levee, and also contacted AECOM Engineers to help come up with a solution. A small sign was posted on-site, but it was determined that barricading the entire area that wastewater was flowing was needed, along with a press release for public notification. Due to the amount of rip rap, severe slope and amount of wastewater discharged damming or diverting the water was improbable and could lead to a large public health issue. The short term plan is to re-route the force main to the east side of the W. Conger Street bridge and connect to the existing force main where excavation and hook-up is easier. The city's goal is to have this completed by the end of the month. The long term plan is to get the required permits from the Corps of Engineers and fix the leak on the levee. This bypass was reported to the DNR on 4/26/2019. MATT CALVERT

Compliance Tracking
Action Type Date Completed Date Comment Delete