Document Name Type File Date Note
Rail Car OWS PM and Maintenance Procedure.doc
Letter (public)
07/30/2012 Revised Train Rack OWS maintenance procedure received from Tristan Grover on 8/22/12
File Name File Type File Date Note
Comments
8/23/2012 On August 22, 2012 We received a revised procedure from Tristan Grover (see attached). Tom Atkinson and I reviewed the procedure and found it to be acceptable. I replied back to Tristan Grover as follows: Tristan, Thanks for the revised procedure. It looks like you addressed all of the concerns we stated in our reply on Tuesday, August 14, 2012. This procedure satisfies the requirement in our letter dated June 12, 2012 to submit a written response as to how Outfall 005 (Train Loading Rack Oil/Water Separator) will be brought into compliance. We will see how the new procedure works going forward from this date. Sincerely, Bill Gibbons Environmental Specialist Iowa DNR Field Office 5 (515) 725-0335 [email protected] BILL GIBBONS
8/23/2012 On August 14, 2012 I sent Tristan Grover a reply to the submittal of the procedure outlining areas that Tom Atkinson and I thought needed Clarification. The reply read as follows: Tristan, Thanks for sending in the procedure for the Train Rack Oil Water Separator. There are a few issues we believe need clarification? 1. When doing the daily checks what is the criteria (level or volume) used to determine if the OWS needs to be pumped? 2. Who does the daily and monthly checks/inspections of the OWS? 3. In the case of a spill at the Train Loading Rack the procedure will be to vacuum out the OWS, clean and inspect it before putting it back into service? Are you going to collect and analyze a sample before allowing the OWS to discharge after the cleaning? Is the piping the leads to the OWS from the train rack also being cleaned after a release and are the collection pans being inspected and all free product removed/cleaned to prevent further product from entering the system? Also, you mentioned that the OWS might have to be cleaned more than one time after a release (you said it was only cleaned once after the first release) at the Train Loading Rack. Please provide a response to these concerns. Changes to the procedure may be needed to address these issues. Sincerely, Bill Gibbons BILL GIBBONS
8/23/2012 On August 9, 2012 we received a written procedure for maintenance of the Train Rack Oil/Water Separator from Tristan Grover with Magellan. BILL GIBBONS
8/3/2012 Meeting on July 30, 2012 Continued: The result of the meeting was that Magellan was going to develop a written procedure for scheduled maintenance to the oil/water separator which involved cleaning the oil/water separator and replacing the filters once per year, and a procedure for cleaning out the separator after any incident where spilled product from the train loading rack went into the oil/water separator. These procedures would be submitted to Iowa DNR Field Office 5 to comply with the requirement in the letter; however they might not meet the deadline of August 13, 2012. We told Magellan we would work with them on the deadline (extending the due date). They believed they could meet the permit limitations with these procedures. It was left open as an option that if the procedures outlined did not result in meeting the permitted limitations for benzene and Total BTEX (additional occurrences of exceeding the limitations) for outfall 005 the oil/water separator that they might request an amendment to the NPDES Permit placing the point of compliance at the West Coffer Dam instead of at the oil/water separator. It was agreed we could revisit the subject if Magellan continued to exceed the permit limitations while following the procedures outlined at the meeting. BILL GIBBONS
8/3/2012 Meeting on July 30, 2012 continued (below it says July 23, 2012 but the meeting actually took place on July 30, 2012): At the meeting were Tristan Grover, Steve Steward, Joe Butler (via phone), Brett Smith (via phone), and Jason Smith (via phone) with Magellan, Dave Hruby with Apex (consultant), Bill Gibbons, Tom Atkinson, and Karen Lodden (via phone) from Iowa DNR. Magellan provided a summary of the three times they exceeded the limits for benzene or total BTEX and the cause, and sampling data from the oil/water separator and the west coffer dam. The summary showed the first two incidents as being related to cleaning and repair of the oil/water separator, and the third incident related to a release at the train loading rack which resulted in product getting into the oil/water separator from the collection pans at the rack. He believed they should have pumped and cleaned out the oil/water separator twice after the release instead of only once. Tristan explained that the west coffer dam only received water from the oil/water separator and there had never been a sample that exceeded the limitations of 5 ug/L for benzene or 100 ug/L for Total BTEX. BILL GIBBONS
8/3/2012 On July 23, 2012 Tom Atkinson and I went to a meeting at the Magellan Terminal to discuss the letter we sent to them dated June 20, 2012 requiring them to do the following: By August 13, 2012 submit a written response as to how Outfall 005 will be brought into compliance. Failure to bring Outfall 005 into compliance could result in the issuance of a notice of violation or other enforcement action. BILL GIBBONS