Ginger West Data Center 2024 (25-17-008).pdf
Inspection Report (public)
03/06/2024 Inspection 3-6-24
File Name File Type File Date Note
Comments
3/19/2024 Reminders: • Notify the Department of the actual start of construction, installation, or alteration and the actual start of operation following the issuance of an air permit. The notices must be submitted via Iowa EasyAir within 30 days of the start of construction or 15 days of the start of operation. [567 IAC 22.3(3)b] • Submit a Minor Source Emissions Inventory to the Iowa DNR Air Quality Bureau no later than May 15, 2026. [567 IAC 21.1(3)] Recommendation: • Physically label each engine with its corresponding emission point number. BRYAN BUNTON