Document Name Type File Date Note
Magellan Pleasant Hill Terminal - Spill 030210-AHB-0849 - FP Recovery - Request to go to Hand Bailing - 123113.pdf
Inspection Report (public)
12/31/2013 Letter to Magellan rearding changing method of free product recovery 010714
File Name File Type File Date Note
Comments
1/7/2014 On January 7, 2014 I sent a letter to Magellan and Apex outlining our acceptance of changing the method of free product recovery from pumping to monthly monitoring with hand bailing (see attached letter). BILL GIBBONS
1/7/2014 On December 31, 2013 I replied back to Dave Hruby's E-mail as follows: Thanks Dave, Your request to go from the free product pumps to monthly monitoring and hand bailing for the first three months of 2014 is acceptable. I will send a letter with regard to this as well. Sincerely, Bill Gibbons BILL GIBBONS
1/7/2014 On December 31, 2013 Dave Hruby with Apex sent me the following E-mail recapping out conversation: Bill, Per our conversation this morning, Apex on behalf of Magellan, plans to shut down the Free Product Recovery System at the Magellan Des Moines Terminal and revise the free product recovery efforts from continuous operation of the recovery system to monthly recovery with hand bailing. As discussed, we’ll monitor the free product thicknesses during the first quarter of 2014 and determine if significant recharge has occurred. In March 2014, we will discuss the need for future operation of the system. Please let me know if you have any other expectations in regards to our conversation and this email summary. Thanks! Dave Hruby Senior Project Manager Apex Companies, LLC 10052 Justin Drive, Suite L Urbandale, IA 50322 O) 515-727-8025 x14 M) 515-979-1444 BILL GIBBONS
1/7/2014 On December 31, 2013 Dave Hruby with Apex Environmental contacted me about changing the method of free product recovery in the truck loading rack area from pumps located in 9 recovery wells to monthly checking of wells with hand bailing. Dave explained that the amount of free product recovered by the wells in recent months was marginal due to little product entering the wells. Dave also mentioned that they had almost recovered the amount of fuel reported in the original release(s). We agreed to allow Magellan (Apex) to do monthly monitoring with hand bailing as the method of free product recovery for the first three months (first quarter) of 2014 and then review data for free product thickness, product recharge (in each well), and amount recovered at the end of the three months to see how to proceed. BILL GIBBONS
Compliance Tracking
Action Type Date Completed Date Comment Delete