5/2/2011 On April 27, 2011 I spoke with Dave Hruby with Apex. Dave said Magellan had completed the cleaning of the oil/water separator and collected samples. BILL GIBBONS
5/2/2011 On Monday, April 11, 2011 Tom Atkinson and I met with Steve Steward and Tristan Grover with Magellan and Dave Hruby with Apex. We discussed the NPDES permit which had been recently renewed (beginning of April) by the Iowa DNR NPDES Permit Section. The main changes to the permit were changing the point of compliance from the outfall at the river levee to individual outfalls within the Magellan Terminal. Of major concern was the outfall for the oil/water separator which is dedicated to the train rack loading system where they load diesel fuel into rail cars. The separator had exceeded what would be enforced limits in April 2011 (benzene 5 ppb & total BTEX 100 ppb) during March 2011. They had decided to clean out the separator which meant having a service company come, enter the separator, and clean the filters inside. This type of maintenance had not been done for about two years. They hoped cleaning the separator would help keep the level of benzene and total BTEX within the permitted limits. Tristan Grover was expressing some concern however that there may be future difficulties meeting the permitted limits for the separator since what was going in to it was water and diesel fuel. Tristan wanted to know if they were having problems in the future if the point of compliance might be changed to the coffer dam (small contained water impoundment) that the separator emptied into before it went into the swamp. Currently the separator collects runoff from the train rack area and automatically pumps out water to the coffer dam when it reaches a set level. The separator is sampled monthly as required in the NPDES permit. Tristan believed the water retained in the coffer dam would receive additional treatment (sunlight and wind) which would help to further break down petroleum constituents before being released to the swamp. Tristan decided to begin sampling the coffer dam to see how those samples compared to the oil/water separator. BILL GIBBONS
Compliance Tracking
Action Type Date Completed Date Comment Delete