Field Office Compliance - Field Activity: Staff Action ID - 56429


Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Activity Report
File Name File Type File Date Note
Comments
11/2/2010 On November 2, 2010 at 11:00 AM I went to the Magellan Des Moines Terminal to look at the replacement of the pipelines that feed the truck loading rack. I met with Steve Steward with Magellan and Dave Hruby with Apex Environmental. All of the old pipes that were still in place when they built the new truck loading rack that still had dead legs on them (old legs that went in the direction of the previous truck loading rack) were removed and replaced. When I arrived all of the new piping was in the ground and they were completing the corrosion protection of the pipe joints by applying coatings and tape. The area had been excavated to native soil the piping replaced and sand used as fill under the new pipelines. All of the soil from the excavation was taken to Metro East Sanitary Landfill. According to Steve Steward they would use a cement mix called flowable mortar that will cover about 3/4 of the diameter of the pipelines. The flowable Mortar does not have rock in the aggregate but has a granular material and does not set up like cement. Water can drain through the material. The pipelines will then be covered with clean rock and 10" of concrete. The clean rock and flowable mortar should facilitate drainage of water to keep the pipelines dry when the water table is below them. The new pipelines have been hydro tested and they are going to test the entire section of lines from the manifold to the south to where the new pipelines connect to the lines that go into the truck loading rack (north end), approximately 800' of lines. Two monitoring wells had to be removed in this process but there are nearby monitoring wells that encircle the wells that were removed. At this time there are no plans to replace the monitoring wells that were removed. The replacement project started on Friday, October 29, 2010 and will end on Wednesday, November 3, 2010. The free product recovery system in this area will be started back up when the project is completed. BILL GIBBONS
Compliance Tracking
Action Type Date Completed Date Comment Delete