Field Office Compliance - Field Activity: Staff Action ID - 36649


Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Activity Report
File Name File Type File Date Note
Comments
4/2/2010 On March 29, 2010 we sent a letter summarizing the events of the release, finding the leak in the pipeline, the geoprobe study to define the free product plume and Magellan's plans for free product recovery. Magellan will put six recovery wells in the area of the free product plume. They were required to submit monthly free product recovery reports and to sample the eight perimeter monitoring wells quarterly For BTEX in the first quarter only and TEH all four quarters. The letter also recommended eliminating all of the dead legs from the main pipelines to the truck loading rack (see attached letter dated March 29, 2010). BILL GIBBONS
3/29/2010 On Thursday, March 25, 2010 at 11:00 AM I met with Steve Steward with Magellan and Dave Hruby with Apex Companies about the geoprobe investigation to define the thickness and lateral extent of the free product plume and to discuss plans for free product recovery. Apex Environmental was commissioned to determine the lateral extent and thickness of the free product plume, and to develop a plan to recover free product. They installed 13 geoprobe wells and measured free product thickness in the wells. Based on the well data and the location of pipelines in the immediate area a plan was developed to install six recovery wells that would be drilled to a depth of 20’ with a screen length of 15’ which would allow free product recovery in either high or low water table conditions. The recovery wells would be equipped with pumps that have a capacity of 300 gph. The plan is to pump free product from the six proposed recovery wells and three existing recovery wells into an on-site storage tank. Steve Steward said he plans on leaving the two excavations open as long as recoverable free product comes into the excavations. The product in the excavations would be recovered with a vacuum truck. Magellan wanted to begin installing the recovery wells on Monday, March 29, 2010. I told them to proceed and that I would send a letter recapping the leak and recovery efforts and their proposal to recover free product. It was agreed they would do a free product check in the geoprobe wells and the eight existing monitoring wells (perimeter wells around the truck loading rack area) monthly and submit a monthly free product recovery report. We also agreed to do quarterly monitoring of the eight perimeter wells and have the samples analyzed for BTEX and Total Extractable Hydrocarbons (TEH) for the first quarter of each year and TEH only for the remaining three quarters. Monitoring reports would be submitted monthly. BILL GIBBONS
Compliance Tracking
Action Type Date Completed Date Comment Delete