2/7/2012 I visited the site to assess progress on the erosion control measures. Very little progress has been made. One concrete storm water drain box near the south-central portion of the fill area has been partially poured. Mike from Shoemaker and Haaland Engineering was also on site. I discussed the cap, wastewater discharge, and erosion control. I provided him my card and told him to call if they had any issues. BRIAN LEE