Field Office Compliance - Field Activity - 23660


Chariton City Of Stp - 310650305
24259 482nd Street Chariton, IA 50049
Lucas County

FO 5

Activity Report
Document Name Type File Date Note
Chariton.pdf
Inspection Report (public)
12/16/2009 2009 inspection report
File Name File Type File Date Note
Comments
8/29/2011 facility inspected with new requirements issued in accordance with 64.3 JANET GASTINEAU
5/24/2010 From: Mark Fincel [mailto:[email protected]] Sent: Monday, May 24, 2010 8:56 AM To: Gastineau, Janet [DNR] Subject: RE: Chariton Janet – We are still working on it; the rains this spring generated a bunch of new data (potential problems); we would like this report update to be the foundation for funding requests later this year; we hope to be through it by the middle of June. Please let me know if there are any problems. Thanks, Mark JANET GASTINEAU
5/24/2010 From: Gastineau, Janet [DNR] Sent: Monday, May 24, 2010 8:47 AM To: '[email protected]' Cc: 'sewage treatment plant' Subject: FW: Chariton Did the PER get submitted to the central office. I have not seen a copy at the FO, which is fine as long as engineering received it. thx JANET GASTINEAU
3/9/2010 From: sewage treatment plant [mailto:[email protected]] Sent: Tuesday, March 09, 2010 8:44 AM To: Gastineau, Janet [DNR] Subject: Fw: Chariton Janet, Here is the latest. Thanks, Steve ----- Original Message ----- From: Mark Fincel To: Stricker, James Cc: sewage treatment plant ; Nels Christensen Sent: Monday, March 08, 2010 4:38 PM Subject: Chariton Jim – There does not seem to be a sewer rehab project in Chariton at this time; we were prepared to submit a I-Jobs application for the rehabilitation of the 12th and Ilion Lift Station and force main until a large inflow source was located and plugged in December 2009. Sewer bypass during a winter rain/thaw event in January was insignificant although the south side system (16th Street lift station) was very much stressed by the flows (showed large flows for system); and since the City was not able to repair 3 other identified inflow sources in the 12th Street Lift Station service area before winter set in, we believe that the most likely final fix for 12th and Ilion will be changing pumps. The City has authorized the installation of a level monitor that will help us predict the amount of flow to be pumped; this unit was to be installed last week, but was delayed. The 16th Street Lift Station Service Area has been operating pretty well since the first two sewer rehabs were completed, and the major sewer project is ready to begin as soon as conditions allow. We do not anticipate a rehab of 16th street based on the need to eliminate treatment bypasses. The City has agreed to smoke test the entire collection system this year; if major rehabilitation work is found, the City will apply for CDBG along with SRF, or other more favorable funding this fall, and they understand that they are to complete the work by October 2011. The plant operation has been exceptional since Steve got the biosolids out of the plant (included the oxidation ditches); please see the attached tables. We will not be able to meet the March 8th revised deadline for the PER amendment, and respectfully request another extension until March 19 so that we can look at the impacts of the Spring thaw this week and also meet with the City to discuss our findings. If March 19th is not acceptable, we will submit the information we have assembled, March 9. Please call me if you wish to discuss, or if you have any questions. Thanks, Mark JANET GASTINEAU
Compliance Tracking
Action Type Date Completed Date Comment Delete