Field Office Compliance - Field Activity: Staff Action ID - 132774


Mitchellville City Of Stp - 310640107
110 2ND STREET NE Mitchellville, IA 50169
Polk County

FO 5

Activity Report
Document Name Type File Date Note
Mitchellville WET 112718.pdf
Inspection Report (public)
01/25/2019 112718 WET results
Mitchellville WT & WW facility follow up 012519.pdf
Inspection Report (public)
01/25/2019 012519 follow up to Mitchellville
File Name File Type File Date Note
Comments
1/29/2019 SRF project update Gastineau, Janet <[email protected]> 10:09 AM (0 minutes ago) to wayne, Contact Update from SRF--you might want to check in with your engineer on why the hold up. I believe this is for the UV portion rather than the lift station, but I could be wrong. Darnell, Karrie <[email protected]> 8:22 AM (1 hour ago) to Theresa, me, Laura The SRF environmental review has been waiting on the local flood plain permit (or determination that the permit is not required). I told the city and engineer that we needed this on 9/7/18. I asked for it again on 9/26, 11/27, and 1/17/2019. I could have issued this CX at the end of September if I had the local flood plain permit. JANET GASTINEAU
1/28/2019 see attached JANET GASTINEAU
1/25/2019 Re: Mitchellville Inbox x Knispel, Laura 2:29 PM (18 minutes ago) to me, Theresa For the WWTF Disinfection Project: Last week Karrie sent an email to their engineer with a question about something she needs for the SRF Environmental Review. I'm waiting on additional technical information from their consultant. For the Lift Station Project: A Facility Plan was approved for this project March 2018, but the City has decided to use SRF now. They are on the IUP and I don't know what the status of the environmental review for that project is. Probably not started because they were only just put on last quarter's IUP list and it's only after formal approval that the environmental review will be assigned and begin. Going through the SRF Environmental Review process takes time - so that definitely will have an impact on their project schedule. I don't know if compliance issues impact the SRF eligibility. JANET GASTINEAU
1/25/2019 Mitchellville WWTP Gastineau, Janet <[email protected]> 2:17 PM (0 minutes ago) to opatton Are you working on the SWPPP, 5-year land application plan for Mitchellville, or repairs to the grit system? These remain compliance issues from the 7/24/2018 inspection. JANET GASTINEAU
1/25/2019 Stopped at the WW plant but no staff available, so I visited with Wayne Patterson at the shop. The grit system is still not operating. According to Wayne they welded it once but it leaked again. He's been in touch to no avail with Vulcan about some kind of retrofit. In the meantime they are operating it manually a couple of times a week. The November 2018 DMR was not submitted properly for WET. I had him correct it and resend it and brought a copy back for FO records. Ran a compliance report from 7/2018-12/2018 and there were no exceedances. According to Wayne the flow meters were calibrated in October and the effluent meter needed to be replaced, which they did. Neither the 5-year sludge plan nor the SWPPP were completed. Adam McCann and Greg Leslie are new employees. Adam will be ready to test in February but Greg is only four months into the job. Paul or Adam are on call and Paul or Wayne mostly do the testing. Greg is doing some weekend work but only chlorine residuals being measured for the PWS. V&K submitted a progress report 9/11/2019. Wayne thinks they are waiting on the DNR's review for projects to be able to go ahead with bidding the project this winter, as was indicated in the progress report. Laura Knispel doesn't think there is anything to report as an update. JANET GASTINEAU