Field Office Compliance - Field Activity - 95257


Des Moines Water Works - 310338211
9966 Maffitt Lake Dr Cumming, IA 50061
Dallas County

FO 5

Activity Report
Document Name Type File Date Note
2617-DSM_Water_Works_(IA7727031)_WS_Sanitary_Survvey_05-30-24.pdf
Inspection Report (public)
05/30/2024 2024 sanitary survey for Saylorville WTP
File Name File Type File Date Note
Comments
8/23/2024 Fwd: L.P. Moon Pumping Station - Pump No. 8 As-Built SubmittalGastineau, Janet <[email protected]>9:28?AM (0 minutes ago)to NathanThere were other responses due by July 22, 2024. I see the construction permit for the added pump at LP Moon is underway. Please submit the full response by August 30, 2024. JANET GASTINEAU
8/23/2024 Naber, Tara9:17?AM (7 minutes ago)to sayers, meScott, Thanks for your time on the phone this morning. We received the electronic fee payment with a copy of the fee calculation form that is equivalent to schedule 1c earlier this month, on 8/12. When you've got the rest of the as-built submittal ready (schedule 1a, schedule 14, and as-built plans/specifications), please send those to [email protected] using PDF attachments (if plans and/or specifications are over 25 MB for the file size, other file share links are okay for those documents). Submittal instructions are available on our website at https://www.iowadnr.gov/Environmental-Protection/Water-Quality/Water-Supply-Engineering/Construction-Permits.Let us know if you have any questions. Thanks,Tara Naber--Tara Naber, PEEnvironmental Engineer SeniorWater Supply Engineering SectionIowa Department of Natural Resources6200 Park Ave, Des Moines, IA 50321515-776-8922 office [email protected]://www.iowadnr.gov/Water Supply Engineering construction permit fees can now be paid electronically through the Iowa DNR Payment System at https://programs.iowadnr.gov/payments/.Thank you, will do.Thank you for the information.Here you go. JANET GASTINEAU
Compliance Tracking
Action Type Date Completed Date Comment Delete
"
"