AO Chantland Resource Recovery Plant, Ames (85-01-050).pdf
Inspection Report (public)
09/28/2022 inspection report
File Name File Type File Date Note
Comments
4/7/2023 4/7/2023: I contacted Bill Schmitt and he reported a permit application had been submitted to the AQB for review. BILL GROSS
11/15/2022 11/15/22 - I received a call that ADS and EDS bagfilters were replaced where needed. BILL GROSS
11/14/2022 11/1/22 response: Recommendation: ? Develop a basis to determine the optimal time for bag filter replacement. Plan of action: The City of Ames will create and implement a formal standard operating procedure (SOP) and monthly log sheet to support the current procedure of monitoring air pressures of the PDS and ADS baghouse filters to ensure filter replacement within set parameters. BILL GROSS
11/14/2022 11/1/22 response: Reminders: ? Contact the Iowa DNR Air Quality Bureau regarding the removal of the cyclone from the ADS exhaust system and the need for construction permits for the ambient air roof vents. Plan of action: Following updated air dispersion modeling by the consultant, a permit amendment application will be filed by March 31, 2023 to document the removal of the cyclone from the ADS system. Plan of action: The City of Ames will provide information to the consultant to verify that the ambient air roof vents function only as general building ventilation and are not connected to any part of the process that generates emissions. The information will also be provided to the Iowa DNR Air Quality Bureau by March 31, 2023 to allow IDNR to make a determination regarding the need to apply for construction permits for the ambient air roof vents. BILL GROSS
11/14/2022 11/1/22 response: Requirement: ? Construct the ADS exhaust stack to meet permit specifications or obtain a permit amendment. [567 IAC 22.3(3)] Plan of action: Engage an engineering consultant for updated air dispersion modeling and determine if a permit amendment may be applied for to reflect the current ADS exhaust stack configuration or if the ADS exhaust stack should be reconstructed to meet the current permit specifications. The consultant determination will be made by January 15, 2023. BILL GROSS
10/11/2022 DC stack does not match permit BILL GROSS
Compliance Tracking