Field Office Compliance - Complaint


Complaint ID - 36121
Clinton City Of Stp - 310639315
4025 S. 30th St, Clinton, IA. Clinton, IA 52732
Clinton County

FO 6

Complaint ID:
36121
Complainant
(L)
Complaint Location
  • Sec:
  • Tier:
  • Range:
  • Lat:
  • Long:
Complaint Resolution
Responsible Party
Report
File Name File Type File Date Note
Comments
7/5/2026 Meetings have been had and more are scheduled involving key City of Clinton staff (mayor, WWTP manager, city engineer and city attorney) along with DNR AQB permitting and compliance staff, to discuss as-built permitting matters that need to be addressed before air permits can be issued. Very few odor complaints have been filed over this past few months, so as we work to address the issues, I am closing these complaints. However, DNR will continue working with the city of Clinton to get the WWTP into compliance. KURT LEVETZOW
3/11/2026 I emailed Stacy the following: For what it's worth, I am sorry you and the other residents are still dealing with the odor.  Thank you for the polite email.  From my office, we have been pressuring the engineering firm to do everything possible to get the flare operational on a continuous basis.  Obviously, they've had their share of issues getting it operational and keeping it running.  I contacted the engineering firm again today and will continue to get updates from them.  Issues started with water entrainment in the gas, which messed with the pilot light. Now that they have resolved that issue, they're thinking the control panel isn't working properly.  Not trying to make excuses, just telling you what I know.  Unfortunately, the Iowa DNR doesn't have odor regulations, so we regulate the treated effluent from the wastewater treatment system and compliance with air permits from their various emission sources. The problem is that no air permits have been issued yet.  The lack of air permitting will be resolved over time, and our legal staff will address that later. For now, air permitting violations aren't causing odor, that's due to the flare not operating.  So, the primary goal now, is getting the flare operating.  That's what we're pushing them to do.  Shutting the system down isn't an option as that would lead to bypasses of untreated sewage and industrial wastewater, causing its own set of compliance issues and additional harm to the environment.  All this to say, we're doing what we can to push them to get their system operating as it's designed to. KURT LEVETZOW

Compliance Tracking
Action Type Date Completed Date Comment Delete