Field Office Compliance - Assistance


Assistance ID - 98103
Iowa Falls City Of Stp - 310639404
212 HOLLIS AVE. Iowa Falls, IA 50126
Hardin County

FO 2

Report
File Name File Type File Date Note
Comments
12/19/2017 From: Mitch Holtz <[email protected]> Date: Tue, Dec 19, 2017 at 8:05 AM Subject: Re: Required response to Iowa Falls pipe failure To: Jonathan Garton <[email protected]> Cc: Casey Welty <[email protected]>, Michael Anderson <[email protected]>, david miller <[email protected]>, Les Wolfe <[email protected]> Jonathan, Last night, the city Council authorized FOX to move forward with an emergency repair of the broken siphon, which will likely include a dam drawdown to install two new pipes to replace the exposed siphon lines. I've reached out to the city to obtain their contact from Renewable World Energies (and/or North American Hydro) to get correspondence going in order to make this drawdown happen at a quick pace. That being said, the overreaching goal for us is to design a project, select a contractor and construct the replacement pipes prior to the spring thaw/rains. To do this, it would appear that we need to select a contractor in early February so that materials may be ordered and the project can be constructed by the end of February. That being said, I would foresee the following....assuming we can get permission from the IDNR: 1. Drawdown begins as soon as possible (early February?). What does the IDNR believe is possible (how fast can we begin)? 2) At all times the dam will pass a minimum of 35 cfs through the dam during the refilling process. This was the flow that was required to pass last time. Let me know if this has changed. 3) What is the maximum rate of release for lowering the impoundment depth? in 2008, the level was lowered at a rate of 1ft/day, however, in our short timeframe, we'll likely want to drop the level at a quicker rate. We'll work with our floodplain folks to help determine this rate, but wanted to see if you have any feedback as we move forward. 4) We are aware of the requirement for public notice and will issue when we can better understand the drawdown criteria we are working with to zero in on the dates of the drawdown. Thank you for your help. This will be a very fast-paced process and we appreciate your attention as we advance the repair of this broken siphon. DAVID MILLER