Field Office Compliance - Assistance


Assistance ID - 98
Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Report
File Name File Type File Date Note
Comments
4/8/2009 E-mail to Dave Hruby with Apex Companies on April 7, 2009 ([email protected]) Dave, This E-mail is a follow up to our conversations on how to properly abandon and plug Air Sparging (AS) and Soil Vapor Extraction (SVE) Wells at the Magellan Des Moines Terminal that are part of remediation units 2008, 2009 & 2010. These remediation units are located in near the train loading rack in what is referred to as the Southern Remediation Area. You called me on Friday, April 3, 2008 to ask me questions on how to properly abandon and plug AS and SVE wells that are part of remediation units 2008, 2009 and 2010 that are located near the train loading rack in the Southern Remediation Area. In a letter dated December 31, 2008 Iowa DNR Field Office 5 gave Apex Companies the go ahead to properly abandon and plug the wells since the remediation units were no longer needed. You had questions on plugging the wells. You described the wells as nests consisting of an AS well (approximately 30’ deep) and SVE well (approximately 15’ deep) that were part of a group of 6 to 8 such pairs. These groups were connected to a manifold through horizontal piping that was placed in the ground approximately 4’ deep. The manifold was vented to what was referred to as the Flame Oxidizer which was used to burn off hydrocarbons that were extracted from the sub surface. You wanted to know how the wells should be plugged and suggested either capping off the wells or back grouting the wells through the horizontal pipes that connect to the manifold. I checked with Russell Tell with the Iowa DNR Water Supply Operations – Private Well Program on what would be the best approach for well abandonment and plugging. Russell said that the best first option would be to disconnect the wells from the horizontal piping and grout each individual well from the ground surface. The horizontal piping could be left in the place without being grouted. If Apex wanted to back grout the wells through the piping that connects the wells to the manifold they would have to document that there was a sufficient volume of material pumped through the piping and into each well to completely grout each well. Based on our conversation you indicated that Apex would likely disconnect the wells from the horizontal piping and grout them from the ground surface. I suggested that you might want to cap off or fill in the ends of the horizontal piping where it was disconnected from the individual wells. You also need to submit well plugging records to the Iowa DNR for the wells that will be plugged. Please submit the well plugging records to: Russell Tell Iowa DNR Water Supply Operations 401 SW 7th Street, Suite I Des Moines, IA 50309 We would also appreciate a copy of the records to be submitted to Field Office 5: Bill Gibbons Iowa DNR Field Office 5 401 SW 7th Street, Suite I Des Moines, IA 50309 If you have any other questions or concerns please contact me at (515) 725-0335, [email protected] Sincerely, Bill Gibbons Environmental Specialist Iowa DNR Field Office 5 BILL GIBBONS