Field Office Compliance - Assistance


Assistance ID - 97418
Muscatine City Of Stp - 312508177
1202 MUSSER STREET Muscatine, IA 52761
Muscatine County

FO 6

Report
File Name File Type File Date Note
Comments
11/15/2017 Brian Stineman, Muscatine Public Works Director, submitted a plan for repairs to the Papoose Force Main to the Water Pollution Control Plant. They're proposing to install a cured in place structural liner inside approximately 950 linear feet of 30-inch pipe from the Musser Park connection to a point west of Grandview Avenue to alleviate open cutting around multiple utilities, railroad tracks, and streets. The remaining approximately 1,400 linear feet of 30-inch pipe will be open cut and replaced from the WPCP to the junction with the lined pipe. In order to make this repair the existing line must be cleaned and televised so that the lining contractor can inspect it and order the liner. The process is anticipated to take approximately two weeks. After the cleaning has been completed a liner can be ordered. He stated it typically takes three weeks for a liner to be manufactured and delivered to the site after its ordered. They anticipate the entire repair and installation of a new pipe will take up to six weeks but will reportedly need to continue bypassing from the Papoose Lift station during this time. They have claimed there is no alternative to bypassing the flow due to the configuration of the collection system. The estimated bypass volume from the Papoose Lift Station is three million gallons per day and allege that city staff have evaluated all possible scenarios and options and have determined that this proposal will be the most rapidly completed and permanent solution. After discussing the city's proposal with management, we've requested additional information on the scenarios and options they've evaluated. TERRY JONES