Comments
7/1/2016 Pender contacted me to confirm that he took over as the OIC on July 1, 2016. We discussed a variety of topics in depth. The in-house lab staff will be certified in the near future. They are farming out tests at this time. I referred him to Kathy Lee to determine the requirements. We discussed the times that construction permits are required to build new or modify water facility equipment. I said that I felt a permit is required to install a new chlorine injection point. I referred him to Taroon Bidar for more information. We discussed the role that they have with the distribution system staff. I stated that properly certified distribution staff must have the lead on distribution system issues, but treatment plant staff (particularly lab staff) can assist. We also discussed the need to increase and stabilize chlorine residuals as soon as possible. Pender was already aware of this requirement, and he anticipates bringing in other technical expertise very soon. I briefly explained that Pender is required to provide thorough oversight of the treatment plant, since he is the operator-in-charge. I stated that this should not be a problem, but there is the potential for his duties at the wastewater plant to intrude on his role at the water plant. We agreed to meet at the plant in the near future. Pender will contact me again about available dates. SCOTT WILSON