Field Office Compliance - Assistance


Assistance ID - 80159
Ames Water Pollution Control Facility - 312530802
56797 280TH ST Ames, IA 50010
Story County

FO 5

Report
File Name File Type File Date Note
Comments
7/27/2015 Dustin, Sorry about the dropped call and then being gone for a few days so I didn’t get right back to you. With regards to the landfills, I’m assuming we’re talking about the Ames SLF and the Ames-Story Environmental SLF East of Dayton. The closure permits for each of these sites indicate that the leachate collection systems are connected to the City of Ames sanitary sewer system and requires that an agreement between the POTW and the SLF be submitted to the DNR. Since the City is authorized by the Industrial Pretreatment Program to regulate the non-domestic users of the system in accordance with the approved program. If historical data justifies removing the dischargers from the list of SIUs, then the DNR rules would not require you to keep the closed landfills in the program. However, in order for the landfills to be able to demonstrate that there is an agreement to allow the leachate to continue to flow into the sanitary sewer, I’d suggest that the documentation justifying the removal from the program also note that they are still authorized to discharge leachate to the sewer system. Regarding the grab sampling of the SIU, I think you’ve got a bit of flexibility. My suggestions would be 1) Require the facility to conduct the grab sampling and analysis for pH at the required frequency and provide you with the data, 2) If the City going to do all of the sampling then make the requirement 1/month, but somehow note that a sample will be collected more frequently if a discharge is occurring during pick-up of the composite sample, or 3) Require the facility to conduct the pH analysis for some of the sampling events and the City will do it at least 1/month. The permit would have to note that the facility is responsible for conducting the monitoring, unless it is conducted by the City. The timing and frequency details could be negotiated outside of the permit. I hope that gives you some guidance. If you have any questions, let me know. Thanks, TOM ATKINSON Environmental Specialist Sr. Iowa Department of Natural Resources P 515-725-0371 | C 515-577-9296 | [email protected] Field Office 5 |7900 Hickman Rd. Suite 200 | Windsor Heights, IA 50324 WWW.IOWADNR.GOV Leading Iowans in Caring for Our Natural Resources. PLEASE NOTE: The DNR's 24-hr Emergency Hotline will change on July 1st to 515-725-8694 From: Dustin Albrecht [mailto:[email protected]] Sent: Wednesday, July 22, 2015 1:55 PM To: Atkinson, Tom [DNR] Subject: Dropped Call Tom, The call was lost with you and I've just tried to call back to the office a few times and I am getting an answering machine. The question regarding the landfills came up while doing a permit renewal for the two former landfills we have in town. The two landfills were close to one another and thus the manholes that our lab collects samples from are close to one another. The collection manhole for one of the landfills is downstream of the collection manhole for the other landfill. Our concern is that the leachate from the upstream landfill is influencing what we collect at the downstream landfill. I have contacted our public works to see if this is the case. I brought this issue up to my supervisor and she suggested contacting you to see what our options were with removing the landfills from the program due to their low impact and possible issue with sample collection. I also have contacted the manager for one of the landfills to see if the data we supply to him is necessary for any of his permits. Another issue I was going to ask about is a problem we have obtaining a grab sample at one of our industries. The industry has an automated system to discharge their tank to the waste stream once the pH level has stabilized. The automatic discharge and the variability in this customer's production schedule have made it difficult to obtain our grab samples. In the past, our lab has asked the customer to hold a tank's discharge until lab staff is on site so that they can collect their grab samples when the composite sample is picked up. We are issuing this customer a new permit and would like our lab to collect a pH grab each time a composite sample is collected (1-4 times/month). However, we do not want to become a burden to the customer's production and ask them to hold a discharge for the lab every time. Is there a way to put into the permit that a pH grab must be collected "when available" (i.e. Wastewater is being discharged when lab staff is on site) and also at a minimum of 1/month? Thanks for any help you can offer and have a good day, Dustin Albrecht Environmental Specialist Water & Pollution Control Department 515.239.5150 main| 515.239.5251 fax [email protected] | Water Plant, 300 E. 5th Street| Ames, IA 50010 | www.CityofAmes.org | ~ Caring People ~ Quality Program TOM ATKINSON