Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Report
File Name File Type File Date Note
Comments
6/10/2015 On June 10, 2015 I sent a follow-up E-mail to Dave Hruby instructing him how to report the missed sample on the EDMR Form per instructions from Tracey Lantz. The E-mail read as follows: Dave, Tracey Lantz who is the person in our office who receives and reviews the Monthly Operation Reports (EDMRs) wanted me to send you the proper instructions on how to fill out the EDMR form. Tracey gave me the following instructions: Since there were no tests taken for the Oil/Water Separator, in the column for Outfall 005 Sampling Event use the indicator of 7-Not Reported. Also Dave if you could put in a narrative that the sample collection was missed and reported to Bill Gibbons at FO5 on June 9, 2015. Sincerely, BILL GIBBONS Environmental Specialist BILL GIBBONS
6/10/2015 On June 10, 2015 I sent the following reply to Dave Hruby: Dave, Thanks for calling me as soon as you noticed the May sample for the Oil/Water Separator at the Magellan Des Moines Terminal had been missed. I spoke with Tom Atkinson yesterday about this and we will not be issuing any type of formal response such as a letter asking what corrective measures would be taken; though you have outlined in your E-mail what those measures will be. Presently this is a one-time occurrence and there is no past pattern of missing these monthly sampling events. Should we start to see more of these incidents in the future we would respond with a letter of non-compliance or notice of violation. Sincerely, BILL GIBBONS Environmental Specialist BILL GIBBONS
6/10/2015 On June 10, 2015 I received the following E-mail from Dave Hruby: Bill, Thanks for taking the time to speak with me this afternoon. As discussed, the May 2015 sampling event at the Magellan Des Moines Terminal was not completed as a result of an Apex oversight. The sampling events are typically triggered by a Work Order created by Apex personnel. Unfortunately the May 2015 Work Order was not created and I was not made aware of the oversight until this morning (June 9, 2015). Immediately after recognizing the oversight, Apex mobilized to the terminal to collect a sample from the Train Rack Oil/Water Separator and W. Coffer Dam. The samples will be submitted today and analyzed under expedited turnaround. As a result of the oversight, effective immediately, Apex will revise our work order process to ensure sampling events are not missed. Apex will utilize an automated notification system and reassign the responsibilities of Work Order creation to experienced personnel in order to avoid a reoccurrence of the oversight. Apex has provided NPDES discharge sampling services for Magellan for the past 10+ years and this is the first and last occurrence of a missed sampling event. As discussed, you indicated you will be speaking with Tom Atkinson about our phone conversation. In the event IDNR would require additional information or follow-up activities, you indicated you would let me know what those items might be. In the meantime, Apex on behalf of Magellan, will submit the May 2015 Discharge Monitoring Report without data. In the comments section, we will indicate the sampling event was missed as a result of Apex error. Please feel free to let me know if you have any questions or if I missed anything. Thank you, Dave Hruby Senior Project Manager Apex Companies, LLC 10052 Justin Drive, Suite L Urbandale, IA 50322 O) 515-727-8025 x3304 M) 515-979-1444 BILL GIBBONS
6/10/2015 On June 9, 2015 I talked to Tom Atkinson about the missed sample. We decided a written response from Iowa DNR Field Office 5 was not needed at this time. BILL GIBBONS
6/10/2015 On June 9, 2015 at 2:30 PM I received a call from Dave Hruby with Apex Companies. Dave was calling to let me know they missed the May sample for the Oil/Water separator at the Magellan Des Moines terminal which is required once every month. Dave said a work order was not generated and they have taken measures to make sure that does not happen again. As soon as the oversight was discovered Dave went to Magellan (on June 9th, 2015) and collected a sample at the oil/water separator and at the coffer dam. I instructed Dave to put on the May DMR that they had missed the sample. Also I told Dave since they missed the May sample there was no need to collect a second sample for June. Dave was also going to send me an E-mail about how they missed the sample and the measures that would be taken to prevent this in the future. I told Dave I would discuss this with Tom Atkinson to see if we might need to send out some type of written response but I did not think we would do so. This was the first time they had missed a sample. BILL GIBBONS