Field Office Compliance - Assistance


Assistance ID - 77276
Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Report
File Name File Type File Date Note
Comments
3/26/2015 We received E-mails from Tristan regarding pumping water from the Des Moines River to conduct hydrotesting of Tank 2701 at the terminal. This is a new procedure where they are pumping from the river over the U.S. Army Corps of Engineers levee to two frac tanks and from the frac tanks to the tank to be hydrotested. They had to obtain a permit from the Corps to pump over the levee. They also have to notify the Corps when they are going to discharge the water to the swamp so the Corps can open the flood gate at the river to let any water gravity flow to the river. I called Tristan to discuss their needing to notify the Corps when they discharge to verify that they are still discharging hydrotest water to the swamp. Tristan confirmed they were still discharging to the swamp but there was a provision in the Corps pumping permit that Magellan had to notify them when they discharged the hydrotest water. In the NPDES Permit it describes the outfall as follows: 004 – Discharge consists of hydrostatic pipeline and tank testing water. This is an internal outfall and the discharge enters the swamp through the East Coffer Dam. During my discussion with Tristan he told me the East Coffer Dam was eliminated during construction of three new large tanks and additional containment of the site (additional dikes constructed to contain new tanks at the site). The East Coffer Dam was replaced with a holding area that releases to the swamp (similar to the function of the Coffer Dam that released to the swamp). I discussed the matter with Tom Atkinson and though this doesn’t likely warrant a permit change we thought it would be a good idea to schedule a site visit to observe and document the change. I contacted Tristan to arrange for a visit. BILL GIBBONS