Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Report
File Name File Type File Date Note
Comments
1/6/2015 The letter mailed 12/31/2014 was incorrectly dated 1/31/2014. A second letter was sent on 1/6/2014 with the correct date (12/31/2014) along with a cover letter explaining the error and telling them to replace the first letter (incorrect date) with the second letter (correct date). See Attached documents for cover letter and 2nd letter with correct date. BILL GIBBONS
12/31/2014 In the October 2014 to December 2014 Quarterly Monitoring Report from Apex Companies, LLC that was prepared for TRC Companies, Inc. (received December 24, 2014) the cover letter from TRC Companies, Inc. made the following request: “The 4th quarter results were within the range of results previously exhibited during the four year post-remediation monitoring period. There is sufficient data to conclude that LGRGs (based on protection of Des Moines River water quality) will not be exceeded at the trigger wells down-gradient of the northern area remediation system or further down-gradient at the Des Moines River. Accordingly, TRC hereby requests IDNR concurrence that the Northern Area Remediation System can be permanently decommissioned and dismantled”. All of the remediation systems in the Northeast Remediation Area had been shut down since January 2011 and a three year period of monitoring (2011 – 2013) with an additional year of monitoring (2014) were completed in December 2014. A letter was sent dated December 31, 2014 approving permanent shut down and decommissioning/dismantling of remediation systems in the Northeast Remediation Area(see letter dated December 31, 2014 in the Attached Documents). BILL GIBBONS