Field Office Compliance - Assistance


Assistance ID - 74823
Atlantic City Of Stp - 310649822
309 SUNNYSIDE LN. Atlantic, IA 50022
Cass County

FO 4

Report
File Name File Type File Date Note
Comments
12/1/2014 Call from Mr. Snyder regarding moitoring frequency at the end of the calendar year. Several parameters (mainly metals) are required to be monitored weekly, however, the 7 day average for these parameters is calculated using days 1 through 7, 8 through 14, etc., through the 28th of the month. So Mr. Snyder was asking if it would be necessary for them to collect metals samples during the last few days of December or would it be acceptable to just skip those days and still be in compliance. Mr. Snyder stated that their usual sampling day is Wednesday which will be December 31st and, therefore, the lab will not be open to receive the samples on the first as one would usually expect, so he was asking if they could just skip the sample collection on those last few days of the month. Mr. Snyder was informed that the counting of 1 through 7 etc., was for 7 day average calculation only and that there are still days in the month beyond the 28th and that those days were also a week which requires samples to be collected. Mr. Snyder was advised that if samples wee not collected for the final week of that or any other month it would be considered an instance of not monitored at the required frequency when conducting DMR review. JERRY JORDISON