10/28/2014 Chad, Good morning. I appreciate the fact that you’re asking questions before the decisions are made and we have to deal with any issues reactively. I have heard from both Kevin Bork and Michael Schrock that this is an option being considered. I’m not sure I know, nor am I sure I care to know, the underlying reasons for exploring this option but I’ll try and provide some answers to your questions. 1) Major WW issues: I’ve attached a recent inspection report that notes the main issues facing the WW dept. In short, the collection system needs some significant maintenance to address the excessive infiltration and inflow. These excessive flows have resulted in multiple bypasses in the collection system and at both treatment plants. There are some operation and maintenance issues to address at the treatment plants as well. Looking forward, the next NPDES permits issued to the City will contain more stringent ammonia limits that may require some upgrades, E coli limits that will require disinfection processes at each plant, and nutrient reduction strategy implementation provisions that may result in treatment plant modifications to allow for biological nutrient removal. I’ll cover Operator Certification below. 2) The expectation at this point is that some major projects and expenditures will occur over the next 10 5-10 years in order to address these WW issues. The inspection report requires submittal of a Plan of Action by April 1, 2015. I anticipate the conditions of the POA will be included in an Administrative Consent Order (ACO) that will set the enforceable schedule for completing the tasks necessary to eliminate bypassing. With the expectation that the next permit will be issued in 2015 and will require additional projects in order to comply with the new conditions, these projects will likely be included in the ACO in some form. This will allow the City to do some planning and prioritization of the necessary projects. 3) Currently the City has two Grade 3 WWTPs. We have given the City the option to either have a Grade 4 operator to oversee both plants or to have two Grade 3 operators. With Kevin and Gina both holding Grade 3 WW licenses, the City is in compliance with the OpCert requirements, although some concerns have been raised about who is actually operating the facilities. My biggest concern at this point is the lack of staff to get the necessary work completed. The treatment plans are very manually operated so they require on site operation as opposed to being able to use any SCADA controls/oversight. I understand that the City is looking to hire a Grade 4 operator to replace Dave and a Grade 3 operator to replace Monte, but have been unsuccessful in actually hiring anyone. Therefore, I suggested that they may need to get a Grade 1 or Grade 2 operator on staff and be working to increase the level of certification of some of the staff as they go. If the Water and WW departments merged, this doesn’t change the requirements for the operator needs at ether the water or the WW facilities. The DNR expects that each facility will be properly staffed with a sufficient number of adequately trained staff. Operators with the proper certification could work at both facilities as long as enough staff is available to get the necessary work done for each facility. It would be possible for one individual that had the proper certification to be the Direct Responsible Charge (DRC) operator at both the Water and WW facilities, but we would require that the individual had some “daily, on site operation of the facility” at each facility. As noted above, the City is in compliance with the OpCert requirement to have operators with certification at the grade level of the plant they operate. There is not a need for your Grade 4 operator to sign the reports, but he could if he was named as the DRC for the WWTPs. If you were looking to get your WW certifications, you would have to ensure the experiential requirements could be met before you could take the exams. 4) For the most part, the rules don’t change if the departments merge. Each facility has its respective permits and regulations that must be met. However, if there is a joint venture that would result in the facilities no longer being owned by a municipality, then there may be some legal aspects that have to get hammered out too, but it wouldn’t change the information stated above. Again, I appreciate you keeping me informed and asking questions to stay ahead of any issues. I talked to Janet Gastineau as well to make sure I didn’t state anything that would conflict with the requirements on the water supply side of things and to keep her informed as well. I wholeheartedly agree that we may fill different roles, but we’re in this together. If there is any further information or assistance we can provide, please don’t hesitate to ask. I’m going to stop there before this turns into a book and I have to hire a publisher. If I missed the mark on any of your questions or completely missed a question, let me know. Regards, TOM ATKINSON Environmental Specialist Sr. From: Chad Coon [mailto:[email protected]] Sent: Tuesday, October 28, 2014 9:02 AM To: Atkinson, Tom [DNR] Subject: Oskaloosa Waste Water Tom, Good morning! My name is Chad Coon. We met this summer in Oskaloosa on C Avenue West. I am the GM for the Osky Water Department. I hope that your day is going well so far. The reason I am writing to you is that the Water Department Board of Trustees and the City have started talks about joining the Water Department with the Waste Water Department. As we are in the beginning stages of this process there are some questions that I have for you from the DNR’s perspective. What are some of the major issues facing the WW dept? What has the DNR proposed to the City as possible solutions to those issues? If water and WW were to join together as a joint department what expectations does the DNR have of that venture? What regulatory hurdles are we facing by doing this? I currently have an employee who has his Grade IV WW license. I currently do not have any WW certification. I would work towards getting my certification, but I would like to know from the DNR side what are your requirements and/or expectations for something of this nature moving forward? Would my operator be able to sign off on MOR’s or is the way the WW dept currently operating sufficient for the DNR? Tom, it is my belief that the DNR is my ally. I would like to keep the DNR updated about what is going on and know that they wouldn’t have to find something out about any facility under my supervision from someone else. I am asking these questions to gain more understanding of any hurdles or hoops that I need to watch for and try to move things forward in a positive manner. Please let me know your thoughts on this issue and what I can be doing to solve some of these issues. Thanks, Chad Coon TOM ATKINSON