Comments
8/1/2014 Eric, Thank you for contacting me regarding this project. Based on our phone conversation, it is my understanding that the reconfiguring of the forcemain is expected to occur next week (likely Wednesday and Thursday). In order to accommodate the construction, the pumps at the 16th street lift station would be turned off on the evening of Tuesday August 5th to allow the forcemain to drain and would be returned to service on Thursday August 7th. During the project, flow to the 16th street lift station would be directed to EQ basin at the lift station. Following completion of the project, flow directed to the EQ basin would be returned to the lift station to be pumped to the WWTP. Since the EQ basin is used for handling peak wet weather flows, if precipitation is forecast during the scheduled timeline it may be necessary to reschedule the project for another time. If anything noted above is inaccurate, please let me know. Otherwise, the City is authorized to direct flow to the EQ basin during this project with the understanding that no discharge will occur from the EQ basin, and all flow will be directed back into the collection system as soon as the project is completed. No additional sampling is required during this event, but the detailed account of the event should be documented and maintained with the City’s maintenance records. I will be out of the office next week so if something changes or you need assistance, please contact the office at 515-725-0268. Regards, TOM ATKINSON Environmental Specialist Sr. Iowa Department of Natural Resources P 515-725-0371 | C 515-577-9296 | [email protected] Field Office 5 |7900 Hickman Rd. Suite 200 | Windsor Heights, IA 50324 WWW.IOWADNR.GOV Leading Iowans in Caring for Our Natural Resources. From: Eric Kirkpatrick [mailto:[email protected]] Sent: Friday, August 01, 2014 9:07 AM To: Atkinson, Tom [DNR] Subject: Force Main Chariton IA Tom- The City of Chariton is putting in a bridge on the south side of town and basically the force main is in the way we are planning on taking out a 90 degree blend on the force main and putting in two 45 degree elbows and moving the force main north out of the way of the bridge, in doing so I need to isolate the force main so the construction can take place. The game plan is to shut down the pumps that feed the force main which are located at the 16th St Lift Station that has the storm overflow basin connected to it, letting the sewage bypass into the lagoon and as soon as the project is complete bringing it back into system. So if it is ok with you we would like to go this route. Would there be a need for any sampling during this process? Thanks Eric Kirkpatrick People Service Inc TOM ATKINSON