Field Office Compliance - Assistance


Assistance ID - 71131
Monticello City Of Stp - 310636005
1105 E 1ST STREET Monticello, IA 52310
Jones County

FO 1

Report
File Name File Type File Date Note
Comments
7/9/2014 Jim contacted the office on 7/2/14 to inform us that they believed they were taking in river water from Kitty Creek. He had investigated and found what was believed to be a hole in the gravity pipe under the creek. At the time the stream levels were high and no sign of WW being discharged was observed. I informed him to hire a contractor ASAP to come on site and begin the process of repair. 7/3/2014 Sue Miller visited the WWTP to observe the impacts from the flooding/ broken line. At that time there was still no indication that WW was discharging into Kitty Creek. 7/7/2014 The office got a call asking for assistance with flood plain permitting while repairing the line under Kitty Creek. I visited with staff on site, accompanied by Doug Hawker, and we observed that WW was being discharged into the stream. It was reported that they could not observe this discharge while the stream levels were still high. At that time is was reported that the pipe which was encased in concrete in 2000 was not breached in a single location but had actually rolled. The City stated they would issue a public notice and notified the nearby canoe rental business on the Maquoketa River. They were directed to begin planning for a temporary line between manholes. Furthermore it was understood that they would contact a septic hauler or similar to begin pumping from the upstream manhole and take the material directly to the WWTP. We then observed the WWTP. It appeared as though very little WW was making it's way to the plant. The city was directed to collect bacteria and ammonia samples upstream and downstream of the bypass. After returning to the office I contacted Mr. Tjaden again who stated that he had issued the PN and collected the samples. I asked that the obtain tank truck to begin hauling WW as it didn't appear the temporary line would be completed that day. On 7/8/14 the city was still bypassing and had not made contact with businesses, as requested, to haul to the WWTP. They did state that the temporary line should be installed mid afternoon. I recevied a call at 1:30 pm stating that the temporary line would be operational w/in the next hour. I aslo informed Mr. Tjaden to ensure contact was made with our engineering section to ensure any new designs were acceptable. AMBER SAUSER