Field Office Compliance - Assistance


Assistance ID - 69311
Fort Dodge Water Supply - 310385018
600 PHINNEY PARK Dr Fort Dodge, IA 50501
Webster County

FO 2

Report
File Name File Type File Date Note
Comments
5/2/2014 I stopped at the water treatment plant to review the S/EP determination with Horrell. Currently, Horrell obtains S/EP samples by forcing all flow temporarily through one iron filter in order to take a filter effluent sample. This is difficult to manage and is not representative of the entire set of wells that are currently included with each S/EP. I agreed to evaluate the options and determine what change should be made to the S/EP designations and testing procedures. The samples need to be representative of the treated water that is delivered to customers. Currently, the water from all wells is blended into two clear wells and one ground storage tank with a combined capacity of 2.5 million gallons before being pumped into the distribution system. This results in a blend of Jordan and Mississippian wells, but the exact blend ratio is unknown. Horrell has one new well to bring on-line, and then he will create a new weekly well rotation schedule. It may be possible to determine an accurate blend ratio at that time. SCOTT WILSON