Field Office Compliance - Assistance


Assistance ID - 57835
Clinton City Of Stp - 310639315
4025 S. 30th St, Clinton, IA. Clinton, IA 52732
Clinton County

FO 6

Report
File Name File Type File Date Note
Comments
3/4/2013 On 03/01/2013 at ~1630 Russ Royce, IDNR FO #6, notified me that he had received a call from Clinton regarding a bypass at a lift station near Joyce Slough. Reportedly one of the pumps was out of service for maintenance and the other pump failed. It was unknown what the volume or flow rate was at the time. Mr. Royce provided the operator's, Bob Milroy, name and phone number in case there were calls, regarding the bypass, from the public over the weekend. On 03/02/2013 at ~0924 I received a page from Brent Earley, IA American - Clinton, requesting information on the volume being discharged. Mr. Earley wanted this information to determine if they should pre-chlorinate or not. Depending on the volume, they would not prechlorinate if the flow rate was small. Mr. Earley was informed that I had not heard anything since being informed of the bypass. Mr. Earley was informed that I had a contact number and could follow up. Mr. Earley asked for the number and indicated he would call, and provide an update. Mr. Earley was provided the information. At ~0945 Mr. Earley called back with an update. Mr. Earley indicated that he had gotten hold of Milroy. Reportedly Mr. Milroy was at a shop in Davenport working on repairing the shaft. Reportedly, Mr. Milroy was hoping to have the unit back in operation by that night, 03/02/2013. The flowrate Mr. Earley obtained from Mr. MIlroy was ~100 gpm. Per Mr. Earley, this was considered small, and with the distance between the discharge and water plant, Mr. Earley did not believe they would need to pre-chlorinate. At ~1026 I received a call from Mr. Milroy, Clinton STP. Mr. Milroy had called to provide an update. Per Mr. Milroy, he dropped the shaft off at a machinist in Davenport. He had hoped it would only take about three hours to repair. However, it was going to take ~8 hours. Mr. Milroy indicated that he hoped to have repairs completed by 2000 or 2100 hours that night, 03/02/2013. Maintenance crews were lined up and ready to go once they the shaft was available. Mr. Milroy was asked where the lift station was located. According to Mr. Milroy, it was the 20th avenue Area lift station. Mr. Milroy mentioned that they had collected samples yesterday, 03/01/2013, and would be collecting another set of samples. Mr. Milroy was asked what parameters they were sampling. Mr. Milroy indicated that they were sampling for ammonia, TSS, & BOD. Mr. Milroy asked if I wanted to be notified when the repairs where completed. The response was yes. At ~1421 Mr. Royce contacted me to determine if I had received any updates. Mr. Royce was provided an update. We discussed options regarding pumping and hauling. I called Mr. Milroy to ask if it was possible to pump to another manhole. Mr. Milroy indicated that they had thought about other options, but the area was covered by force mains and they would have to run the lines over several blocks and railroad tracks. Therefore, it was not an option. Mr. Royce was contacted and provided the information. Mr. Royce indicated that he would contact the Field Office Supervisor and update him to the situation. On 03/03/2013 Mr. Milroy called to notify the department that the repairs had been completed as of 2345 hour on 03/02/2013. As the call concluded, Mr. Milroy indicated that they would follow up with a report once they received the sample results. MARK HEIDERSCHEIT