Field Office Compliance - Assistance


Assistance ID - 51973
Ames Water Pollution Control Facility - 312530802
56797 280TH ST Ames, IA 50010
Story County

FO 5

Report
File Name File Type File Date Note
Comments
9/10/2012 From: Bason, Kate [DNR] Sent: Thursday, September 06, 2012 1:02 PM To: 'Michael Klocke-Sullivan' Cc: Gross, Bill [DNR]; Bunton, Bryan [DNR] Subject: RE: Ames Water Pollution Control - Air Quality Inspection “Calendar quarter" means a period of 3 consecutive calendar months, Jan. - March, April - June, and so forth. Although calendars identify Sept. 22 as the official beginning of fall, we’ve typically used the calendar quarter. Kate Bason Department of Natural Resources, Field Office #5 401 SW 7th St., Suite I Des Moines, Iowa 50309 Office: 515-725-0333 From: Michael Klocke-Sullivan [mailto:[email protected]] Sent: Thursday, September 06, 2012 11:08 AM To: Bason, Kate [DNR] Cc: Gross, Bill [DNR]; Bunton, Bryan [DNR] Subject: Ames Water Pollution Control - Air Quality Inspection Ms. Bason: I received a copy of the Air Quality Inspection report from your most recent inspection, that was sent to Jim McElvogue on August 27, 2012. I just wanted to confirm one piece of information from the inspection vs. our permits. On Permits 11-A-008, 11-A-009, and 11-A-010, under Section 15(B) it states the following: For each of the first four calendar years after the issuance of this permit, the permittee shall obtain one sample of the digester gas burned in emissions units EU 11-0001, EU 11-0002, and EU 11-0003 and shall perform an analysis for the hydrogen sulfide content of the digester gas. These samples shall be obtained during different calendar quarters (i.e. winter, spring, summer and fall) during this four year period For each gas sample taken, the permittee shall record the following information: date the sample was collected, the name of the laboratory that performed the analysis, the method used to analyze the gas and the hydrogen sulfide concentration in parts per million by volume. After the initial four year sampling period, if the hydrogen sulfide content has never exceeded 4000 ppmv, the sampling shall be reduced to once every 3 years. If the hydrogen sulfide content of the digester gas has exceeded 4000 ppmv, annual sampling shall continue. I just wanted to confirm with DNR when we are required to sample. I received confirmation last Fall from Bryan Bunton that the 12/28/2011 sample would count as our "Winter" sample. What I did not ask for is a clarification on the definition of "calendar quarters". We were planning on collecting a "Fall" sample for 2012 and I just wanted to confirm the dates for that. From reading the permit, it seems that we can collect the sample between September 22, 2012 and December 21, 2012 which is the calendar quarter of Fall. However, from reading the inspection report, it seems that we need to collect this sample in a quarter other than "4th Quarter", since that is when we collected it in 2011. Could someone please clarify for me the deadline for collecting a "Fall" sample for hydrogen sulfide in 2012? We are bidding this now and I would just like to have a definitive date to give to our contractor. Thank you. Sincerely, Michael Klocke-Sullivan Environmental Specialist 515.239.5150 main| 515.230.9564 cell| 515.239.5251 fax [email protected]| 300 E 5th Street, Bldg. 1 | Ames, IA 50010 www.CityofAmes.org | ~ Caring People ~ Quality Programs ~ Exceptional Service ~ KATE BASON