Field Office Compliance - Assistance


Assistance ID - 46177
Magellan Pipeline Co, Llc - Des Moines - 311467744
2503 SE 43RD ST. Des Moines, IA 50327
Polk County

FO 5

Report
File Name File Type File Date Note
Comments
5/24/2012 On May 1, 2012 we received a response (update) from Keith Piontek which was a revised proposal regarding changes to remediation systems in the Northeast Remediation Area as part of the tank construction project. The update listed monitoring wells that would be removed and not replaced, and the air sparging wells that would be removed and which ones would be retained. The ALT (with the exception of ALT well A-12) will be kept in place and available for re-initiation of treatment operations in the event that Levee Area Groundwater Remediation Goals (LGRGs) are exceeded in the trigger wells. The update stated that “ALT operations will provide assurance that plume migration toward the Des Moines River can be mitigated near the down-gradient edge of the former LNAPL zone (if necessary).” The electrical service to the ALT would be terminated as part of the tank construction project but they would strive to have electrical service in place by mid-June 2012. The update also addressed the removal and replacement of the three sentinel wells MW97-38, MW97-39 and MW97-40 showing the new locations in Exhibit A (of the update). The replacement wells would still be located on the west side of the ALT and the update stated the replacement locations shown in Exhibit A illustrate that they would still serve the purpose of monitoring groundwater quality near the down-gradient edge of the source area consistent with the objective of the original wells. The wells would be installed in time for the June 2012 monitoring event. On May 22, 2012 we sent a letter to Lorraine Woxell with Magellan stating that we found their revised proposal to be acceptable (see attached letter). BILL GIBBONS
4/16/2012 On April 13, 2012 I received an E-mail from Keith Piontek with TRC in response to the letter we sent to Magellan on 3/28/2012: Bill, I wanted to give you an update on the tank construction project. Magellan is re-evaluating whether or not the tank project can be configured so that the ALT system can be left in place. Once we have a final determination on that matter, we will respond to your letter. Please contact me with any questions or comments in the meantime. Have a good day. Keith R. Piontek, P.E. Program Manager 13 East Second Street, Suite B, Eureka, MO 63025 T: 636-938-3907 Ext. 11 F: 636-938-7294 Follow us on LinkedIn or Twitter | www.trcsolutions.com BILL GIBBONS
3/30/2012 On March 16, 2012 Bill Gibbons with Iowa DNR Field Office 5 received a letter from Keith Piontek with TRC Solutions outlining an upcoming major construction project at the Magellan Des Moines Terminal that is scheduled to begin on April 15, 2012. The project would be for the construction of two large above ground storage tanks (295,000 barrel capacity – 196’ diameter x 60’ high and 460,000 barrel capacity – 238’ diameter x 60’ high) on the eastern portion of the terminal and would include widening and expanding of one of the access roads, construction of a large earthen containment berm, and installation of new pipelines within the terminal. This construction would also include removal of key parts of the now shut down remediation systems in the northeast area including the Air Lift Circulation Trench (ALT), 60 air sparging (AS) wells and a control building, and removal of twelve monitoring wells including the three sentinel wells (MW97-38, MW97-39 & MW97-40) that are part of the current site monitoring plan. The letter from Keith Piontek stated that “remediation system components and/or groundwater monitoring wells deemed necessary to the on-going corrective action projects at the terminal would be replaced following completion of the tank farm expansion project or as otherwise appropriate”. Keith was asking for Iowa DNR to review the information including the first quarter monitoring report and to give an answer as to whether DNR would approve the removal of the Air Lift Circulation Trench and 60 Air Sparging wells as part of the project. We sent a letter on March 28, 2012 asking Magellan and TRC for more specifics on what measures would be taken if treatment of groundwater contamination would need to be resumed in light of removal of these systems (see attached letter dated March 28, 2012). BILL GIBBONS