2/9/2012 On January 31, 2012 I received a report from Apex (written by Dave Hruby) titled "May 2011 Permit Exceedence Investigation Results". The report explained that they had been testing the discharge from the Oil/water separator every two weeks and had a line tightness test done on the discharge line from the separator. From June 2011 through December 2011 none of the samples exceeded permit parameters for Benzene or Total BTEX; the line tightness test showed the discharge line to be tight. The report concluded that the exceedence of permitted levels for benzene and total BTEX in May 2011 was an anomaly. As of January 31, 2012 sampling will return to a frequency of once per month as required in the permit. They will continue to do regular scheduled maintenance (cleaning) of the oil/water separator as well. BILL GIBBONS
6/22/2011 On June 14, 2011 I received a call from Dave Hruby with Apex Companies. They had sampled the Oil/Water Separator on June 8, 2011 and the results came back below the limits specified in the NPDES Permit for Benzene and Total BTEX. Dave said they would continue to sample the separator bi-weekly (as I had discussed with Tristan Grover a few days earlier) and they were going to televise the line (from the train loading rack to the separator) as soon as it was approved by Magellan Corporate. BILL GIBBONS
6/2/2011 On June 2, 2011 at 8:45 AM I received a call from Dave Hruby with Apex Companies. They collected samples from the oil/water separator for the diesel train loading rack and the laboratory analytical results came back in exceedence of the limits specified in their NPDES Permit for total BTEX. Benzene was 4.2 ug/L, toluene - 36.7 ug/L, Ethylbenzene - 32.8 ug/L and xylenes - 259 ug/L for total BTEX - 332.7 ug/L. The permitted limit is 100 ug/L. They had cleaned out the oil/water separator in April and were still very close to their permitted limits for April and this most recent sample exceeded their permitted limits. Dave said they also sampled the pipe coming from the separator and water in the coffer dam. They did not yet have the laboratory results for the other two samples. Dave said they were going to have a meeting (Steve Steward, Rodger Teasdale, Tristan Grover, and Dave Hruby) to discuss ideas on how to get into compliance. Dave Hruby thought the high BTEX number was unusual for a source area that was strictly diesel fuel. I suggested to Dave that the piping from the collection pans at the train loading rack to the separator might have a hole in it and groundwater from the surrounding area might be getting into the pipe (the pipe is in the ground and with recent rains the water table could be high at the terminal). There is a history of contamination (soil and groundwater) in that area. I told Dave they might want to check the pipe by using televising, a tightness test, or other test method. Dave said he would pass along my thoughts and call back to update me after the meeting. BILL GIBBONS