11/23/2010 On Monday, November 22, 2010 I received a call from Tristan Grover. He told me they had completed the discharge of the hydro test water from the tank that day about 12:00 PM. During the event they monitored pH at the coffer dams and at the levee gate every 8 hours and the pH ranged from 7.60 to 7.80. He said they have not noticed a rise in the water level at the levee gate at this point however they are going to continue to monitor the water level and pH at the levee for at least two more days. Tristan said they would enter the discharge information in the operation report and we agreed to put the pH monitoring in as a narrative instead of inserting it in the area where it would show sampling for a discharge at the levee gate (outfall 001) because they were not actually discharging from the swamp to the river. BILL GIBBONS
11/23/2010 On Friday November 19, 2010 I received a call from Tristan Grover. Tristan told me they had started discharging that morning after they had a short meeting about monitorng the situation. They decided to discharge 24 hours per day instead of just during daylight hours because it looked like the weather was going to turn cold soon. He said they would discharge into the tank impoundment which went tot he coffer dams which drained to the swamp. They planned on monitoring the water level at the levee gate, and taking pH readings at least every 12 hours. I told Tristan this would be fine but to keep a close eye on the water level at the levee gate. BILL GIBBONS
11/18/2010 I called Karen Lodden back to let her know that Magellan would begin discharging in the morning (Friday, November 19, 2010) however they would only discharge during the day, monitor the water level every morning and afternoon, and check the pH of the water in the swamp behind the levee. I told Karen that I had reminded Tristan that they would have to collect samples and report flow from the levee if the water level was raised high enough for water to flow from the swamp to the river through the levee gate. I also told Karen that I relayed to Tristan that after the permit was renewed (renewal by the end of 2010) they would have to meet the pH requirement and needed to obtain a construction permit to treat the hydro test water in the future. I told her I let her know how the monitoring was going during this discharge. BILL GIBBONS
11/18/2010 I called Tristan Grover and told him under the current permit they could discharge the hydro test water to the swamp however I wanted them to monitor the discharge point at the levee to make sure they were not raising the water level high enough to create a discharge through the levee gate. Tristan said they would start discharging tomorrow morning (Friday, November 19, 2010) and that they would check the levee outlet each morning and afternoon to check the water level in the swamp. I told Tristan if the water was going to go through the gate to the river they would have to collect samples and report the results on the operation report. Tristan said as an added measure they would check the pH of the water behind the levee (on the swamp side) each morning and afternoon to see if there was any effect on the water in the swamp. I asked Tristan to let me know when they finished discharging the hydro test water into the swamp and how the pH testing of water at the levee came out. I also reminded Tristan that he needed to note in their operation report that they had consulted with the field office about the pH greater than 9 and had been given permission to do so under the conditions of monitoring the levee. BILL GIBBONS
11/18/2010 I talked to Ted Petersen (Supervisor of Field Office 5) and told him I had talked to Karen and under the current situation we had concluded that they could discharge under the current permit. I told Ted I did not see a need for Magellan to treat the water to lower the pH from 10 to 9 since it was going to mix with other water in the swamp and there would not be a discharge to the river at this time of year anyway. Ted agreed that we could do that this time. I told Ted that I would inform Tristan that Magellan needed to prepare for the next time this would happen by obtaining a construction permit from wastewater engineering to treat the water if needed. BILL GIBBONS
11/18/2010 I talked to Dennis Apelhons and Ted Peterson about the situation. Dennis said that the pH of water in the system was usually greater than 9 and showed me references in the Des Moines Water Works web site where it said the water was usually a pH of 9.44 or greater. I called Karen Lodden and we talked about the situation. Currently the only regulated outfall is at the discharge point through the levee to the river. At this time with there being little recent rainfall they would not be discharging from the swamp to the river. It was decided under the current permit conditions they could discharge the water to the swamp and we would not require treatment, however when the permit is renewed (by the end of 2010) the new point of compliance will be from the tank to the swamp and they will have to meet the pH limit of 6 to 9. Karen said if this came up again they should submit a construction permit application to obtain a permit to treat hydro test water if needed. I told her I would pass this along to Tristan and tell him once the new permit was issued he needed an approved construction permit to be able to lower the pH if it were necessary to do so. I also told Karen I would have them monitor the levee discharge point to make sure they were not discharging to the river or if they did discharge that samples would be collected (as required) and reported in their operation report. BILL GIBBONS
11/18/2010 On Thursday, November 18, 2010 I received a call from Tristan Grover with Magellan Midstream Partners. They had replaced the bottom of an above ground storage tank at the Des Moines Terminal and conducted a hydro test of the tank using 1.5 million gallons of water. They were getting ready to discharge and took samples according to the NPDES Permit and the pH came back as 10. They used Des Moines water for the hydro test and he checked the pH at the hydrant and it was 10, all other parameters below detection limits. The permit gave a range of pH of 6 to 9. He had talked to Karen Lodden in Wastewater Permits and she told him they could not discharge the water even if it was from the municipal water supply (Des Moines Water Works). Tristan proposed treating the water to lower the pH by using a weak acid and Karen informed him there was no provision in the current permit for treatment (no approved construction permit). Tristan called me asking what options he might have. I told him I would look into it and also talk to Karen Lodden and get back to him. BILL GIBBONS