Field Office Compliance - Assistance


Assistance ID - 138235
Waterloo City Of Stp - 310652027
3505 EASTON AVENUE Waterloo, IA 50702
Black Hawk County

FO 1

Report
File Name File Type File Date Note
Comments
6/24/2026 Power restored on 6/24/26. Initial findings indicate activated sludge ok and they anticipate they can meet effluent limits. MICHELE SMITH
6/23/2026 Power still out. No bypassing at this point. Storing raw wastewater. Will be bringing in other generators as they find them. Are considering requesting reduced usage since they estimate they still have only one day remaining of storage capacity for raw water. When power to the plant is restored, if treatment is inadequate a press release will be issued for the outfall. MICHELE SMITH
6/23/2026 Called to report that power was out to the plant after a central transformer in the metering bay failed and electrical arcing damaged Waterloo's gear. Unsure of consequences to activated sludge depending on length of time it takes to replace the equipment and re-aerate. MICHELE SMITH