5/7/2026 Telephone conversation with follow up email from Libby: Thank you for taking my call today! Like I mentioned on the phone, Story Construction is preparing to complete the tie into the City’s existing system, and needs to have a temporary partial bypass to do this work. Story was able to bump up their schedule, and is looking to have the bypass next week (potentially as soon as Monday, May 11th). The bypass would be partially treated, having gone through screening and grit removal, primary and intermediate clarifiers, and primary trickling filters. The flow would not go through nitrification towers, final clarifiers or UV disinfection. We’ve included in the spec language that Story can only do this work during dry weather flow, because if they were bypassing during a storm event, there is a potential that the flow would need to bypass primary treatment as well. We’re reiterating with them that is not an allowable plan, but I wanted to note the City does have the ability to do a full bypass of primary treatment as well. We plan to fill out the attached “Bypasses and Upsets” form once the bypass is completed. Could you please reply to this email with any tests you’d like the City to perform during the bypass? We’re asking Story to complete this work as quickly as possible to limit bypass days, and will keep you in the loop via email each day the bypass is occurring. I responded with: Libby~ Thanks for the phone call and follow-up email. It was a good reminder/prompt for my conversation with Jim yesterday. The anticipated bypass is approved. The required testing will be to just continue following the sampling required in the NPDES permit. Jim said he has a portable composite sampler for collecting samples. We will plan to issue a press release advising downstream users to stay out of the receiving stream. We will draft a press release that will be ready to send when we know the date. KRISTI BURG