Field Office Compliance - Assistance


Assistance ID - 137676
Keokuk City Of Stp - 310636041
1000 MISSISSIPPI DRIVE Keokuk, IA 52632
Lee County

FO 6

Report
File Name File Type File Date Note
Comments
4/16/2026 Tom called to let us know that the wastewater line associated with CSO Outfall 002 appears to be plugged. A little bit of rainfall results in a CSO at outfall 002. Additional investigation will be conducted. I told Tom to notify us when a bypass or SSO occurs that is not wet weather related. I told him there is a 24 hour time frame for notification of a bypass. I told him if the event is wet weather related we classify that as a CSO and does not have to be reported. He said it will take time to gather the data and the City may not know right away if the discharge is a CSO or not. I told him that the 24 hour timeframe will start once they know it is a bypass (or non-wet weather related event). See email from Tom (WW OIC): On Thu, Apr 16, 2026 at 3:29?PM Tom Wills <[email protected]> wrote: Brian, On April 1st 2026, We brought installed sampling and metering equipment on line to record flow and trigger sampling during rain events. With a lot of data being collected, we are aligning all the different sources to report accurately. Upon installation of the flow metering equipment in the new manhole at the intersection of 3rd Street and Des Moines Street, the City observed several overflows between April 1, 2026 and April 15, 2026 that occurred with varying levels of rainfall. The overflows occurred without the City regulating the flow with the gate on the 30” sanitary sewer carrying flows to the water pollution control facility. The overflows were unexpected under low rainfall conditions, and the City has been investigating potential factors that may contribute to the overflows. The City is actively working to investigate and resolve issues that my be contributing to the unexpected overflows. Preliminary investigations indicate an obstruction in the 30" (reduced to) 24" sewer line entering the WRRF. The Sewer Dept. is looking to isolate that line, vacate the water, and gain access to observe the obstruction. The obstruction will be removed with the utmost diligence taking into account the composition of the obstruction. Obstruction removal should be complete by April 24th at the latest. The City plans to televise the 30” line and review the operation of the gate as soon as flows are low enough to allow them to investigate. Corrective measures are expected to be completed by the end of April, 2026. Thank you, Tom Tom Wills City of Keokuk WRRF City of Keokuk WRRF BRIAN LEE