Field Office Compliance - Assistance


Assistance ID - 132657
Ames Water Pollution Control Facility - 312530802
56797 280TH ST Ames, IA 50010
Story County

FO 5

Report
File Name File Type File Date Note
Comments
9/26/2024 Much appreciated! Will be sure to mark it when used. Tyler Ver Meer WPC Superintendent Water Pollution Control Dept. 56797 280th Street | Ames, IA 50010 (515) 239-5335 main [email protected] www.CityofAmes.org From: Bunton, Bryan <[email protected]> Sent: Thursday, September 26, 2024 1:08 PM To: VerMeer, Tyler <[email protected]> Cc: [email protected]; Dilparic, Daria <[email protected]> Subject: Re: City of Ames WPC Nutrient Project Sampler Location Tyler, Thank you for bringing this to our attention. Larry and I discussed the matter and we are comfortable with the proposed monitoring location, understanding that it will be used only on an as needed basis during construction. If you could kindly make a note on the DMR when the sampling from the disinfection building location is used, that would be appreciated. Regards, BRYAN BUNTON Environmental Specialist Senior Field Office 5 | Field Services & Compliance Bureau Iowa Department of Natural Resources 6200 Park Avenue, Suite 200, Des Moines, IA 50321 C: 515-201-3128 | O: 515-725-0268 [email protected] www.iowadnr.gov On Thu, Sep 26, 2024 at 10:01?AM VerMeer, Tyler <[email protected]> wrote: Hello Larry and Bryan, Reaching out to both of you as Larry was listed by our engineering firm, Strand, as the person looking over the project and Bryan as you have been the latest contact for us during our inspections. Please pass along to anyone else who should be involved. As part of our Nutrient Reduction Modifications Phase 1 here at the facility we are having to look at doing some piping relocations that could affect our Final Effluent Sample during rare instances where we back up our interceptor sewer due to high flows or needing to do a temporary shut down of the plant for construction purposes. Our permit currently states that our effluent composite sample be taken from “CONTROL BOX DOWNSTREAM FROM FINAL CLARIFIERS (PRIOR TO DISINFECTION).” Due to the need to move reroute some piping and ultimately changing the location of our samplers long term for this project, I wanted to reach out and make sure our temporary sampling plan is ok and does not go outside of what our permit states. The “control structure” in the attached picture is the current sampling point for us. In a scenario where we have the interceptor backed up due to high flows or a shut down, we would like to be able to have a sampler placed in the disinfection building right at the point where you can see the flow coming through the pipe up into the disinfection building. This sampler for right now would have to be time paced instead of our normal flow paced for the 24-hour composite. The sampling still occurs prior to the actual disinfection process and is coming directly from the control box but as a matter of technicality it is not being sampled directly out of the “CONTROL BOX DOWNSTREAM FROM FINAL CLARIFIERS.” This location is also the intended composite effluent sample location for when this project is completed, that particular part though is not slated to be constructed for a while which is why we are looking to use the area only on an as needed basis. When used we would note that in the DMR for that month. Please let us know if this location is suitable to be used as needed or if there are any other questions regarding it. Much appreciated, Tyler Ver Meer WPC Superintendent Water Pollution Control Dept. 56797 280th Street | Ames, IA 50010 (515) 239-5335 main [email protected] www.CityofAmes.org BRYAN BUNTON