Field Office Compliance - Assistance


Assistance ID - 131440
Burlington City Of Stp - 310649171
101 SOUTH ST. Burlington, IA 52601
Des Moines County

FO 6

Report
File Name File Type File Date Note
Comments
5/29/2024 FYI form Don regarding transformer/emergency power issues/upgrades: On Wed, May 29, 2024 at 12:05?PM Don Fitting <[email protected]> wrote: This is the written summary to the phone call made earlier today to not notify Field Office 6 (DNR) od the temporary reduction to only one (1) power supply to the south end of the Burlington, IA Wastewater Treatment Plant. One (1) of the two (2) 750 KVA padmount transformers supplying electric power processes located at the south end of the plant was determined to be deteriorating and recommended to be replaced. We have shut down the transformer to be replaced and removed it in preparation for the delivery and installment of its replacement, which is expected to occur sometime early next week. We have a contingency plan in place to supply emergency power to critical process equipment using facility- owned trailer- mounted generators and wiring in the instance we lose power from the one (1) remaining power supply to the south end of the plant . The north end of the plant continues to have the normal two (2) power supplies, the north end having its own 1000 KVA transformers. Treatment processes unaffected by the temporary shut down at the south end: Preliminary, Primary, Secondary/ Activated Sludge and Secondary Final Clarifiers (all part of the north end of the plant). Treatment processes located at the south end: Chlorine contact/ Disinfection of Final Effluent, Dissolved Air Floatation, Sludge Blend Tank, and Anaerobic Digester with appurtenances. A temporary loss of power to the south end of the plant will result in a period of time when the final effluent entering the chlorine contact tanks would stop being dosed with chlorine gas for disinfection until the trailer- mounted generator(s) was manually started by plant personnel and emergency power supplied to critical process equipment. I will let you know once the new transformer has been installed and we are back to the required two (2) available power supplies to the south end of the plant. If you have any questions or need for additional information, I can be reached at (319) 753- 8157. Respectfully Don Fitting Update 6/11/24: On Tue, Jun 11, 2024 at 10:28?AM Don Fitting <[email protected]> wrote: Brian The previously reported project to replace one (1) of our 750 KVA transformers was successfully today. At no time during the project did we lose our second source of power to the south end of the plant which would have necessitated using our contingency plan using trailer- mounted generator(s) to supply electrical power to select pieces of process equipment, while still resulting in a temporary/ short duration of discontinuance of feeding chlorine gas used to disinfect the plant’s treated effluent. No ”bypassing” (interruption of the disinfection process) occurred during or as a result of this maintenance project. If you have need for additional information or clarification, I can be reached at (319) 753- 8157, M-F, 7 AM- 4PM. Respectfully, Don BRIAN LEE